Laserfiche WebLink
0,04ESOrq <br />o r ti Minnesota <br />Department of Transportation <br />District 9 <br />stir ye 3485 Hadley Avenue North, Box 2050 <br />OP1 North St. Paul, Minnesota 35109 <br />October 5, 1982 <br />Mr. Joseph G. Chlebeck <br />City Clerk <br />515 Little Canada Road <br />Little Canada, Minnesota 55117 <br />In reply refer to: 319 <br />S.P. 6280 (T.H. 35E) <br />Little Canada Storm Water Impr. 81 -15 <br />Pond and Pumping System <br />N.W. Corner.T.H. 36 and 35E <br />Dear Mr. Chlebeck: <br />grompNi <br />OCT 7 1982 <br />CITY OF <br />LITTLE CANADA <br />(61 2) 770 -2311 <br />We have completed our review of the above referenced preliminary plan for <br />a pond and pump facility as requested in your letter of September 8, 1982. <br />We concur in your determination that 11.6 acres of highway right of way are <br />draining to the pond. On this basis the proposed improvement would be <br />eligible for Mn /DOT cost participation. Mn /DOT cost responsibility could <br />be met through assessments in accordance with Minnesota Statutes 435.19 <br />(a copy is attached) or by a cooperative construction agreement. The <br />amount of Mn /DOT cost participation would be determined after a review <br />of final plans and computation considering the following criteria: <br />1. The system provides a positive outlet for highway drainage. <br />2. The system is designed to safely discharge a 100 year frequency <br />rainfall event. <br />3. The physical appurtenances of the system, including the pond, is <br />1Jcated on publicly owned right of way. <br />4. Maintenance of the system would be the responsibility of the City. <br />Maintenance access to the system cannot be provided from the highway. <br />In addition, before any construction is allowed in this area a construction <br />permit must be obtained from this office. There are utilities in the area <br />and Mn /DOT has an existing right of way fence and frontage road that will <br />require restoration or protection from this construction. Final plans would <br />be required before any construction permit could be issued. <br />An Equal Opportunity Employer <br />