My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-12-1982 Council Agenda
>
City Council Packets
>
1980-1989
>
1982
>
05-12-1982 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2013 1:20:00 PM
Creation date
5/21/2013 1:18:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Construction Plans: Construction plans shall include detailed <br />working drawings with sufficient sections, elevations and struc- <br />tural details to enable a prospective Contractor to quote or bid <br />a firm price on the work without additional engineering. The <br />Construction Plans shall comprise forty percent (40 %) of the <br />basic fee. <br />4. Construction Specifications: Specifications shall be of sufficieri <br />scope to enable a prospective Contractor to quote or bid a firm <br />price based on a set standard of quality, performance and proce- <br />dure. The Specifications shall comprise thirty percent (30 %) of <br />the basic fee. <br />B. BASIC FEE SCHEDULE <br />The percentage rates shown below shall be considered full compensation <br />for the Basic Services outlined above, for assisting in the taking <br />and tabulatin of bids and for reviewing the bids and submitting a <br />recommendation regarding award (See Section II, Paragraph H on <br />Rebidding): <br />a. Less than $20,000.00 per diem rates <br />b. $20,000.00 to $50,000.00 8.5% <br />c. $50,000.00 to $100,000.00 8.0% <br />d. $100,000.00 to $200,000.00 7.5% <br />e. $200,000.00 to $500,000.00 7.0% <br />f. $500,000.00 to $1,000,000.00 6.0% <br />g. $1,000,000.00 and over 5.5% <br />The percentage rates apply to the lowest responsible bid unless a <br />portion of the work on which Engineering Services were performed is <br />deleted by the Owner prior to the taking of bids. If the latter <br />occurs, the percentage rates shall apply to the low bid and <br />the Engineers shall receive additional compensation for services <br />performed on the deleted portion of the work based on the Per Diem <br />
The URL can be used to link to this page
Your browser does not support the video tag.