Laserfiche WebLink
A. CONSTRUCTION SUPERVISION <br />This includes all time spent by the Engineer after Award of Contract <br />in performing the following tasks: resident supervision, inspection, <br />preparing change orders, "as- built" drawings, periodic pay estimates, <br />instruction manuals, review of shop drawings, furnishing additional <br />details as may be required to carry out the intent of the working <br />drawings and checking of the Contractor's invoices and a final <br />review of the work upon Contractor's declaration of .completion <br />together with the furnishing of a list of any found deficiencies <br />and omissions and a final certification of completion of the <br />project. <br />B. SURVEYS <br />This includes all time spent by the Surveyor and crews setting <br />construction stakes, performing property surveys (including legal <br />descriptions when required) and resetting monuments destroyed by <br />construction. <br />C. LEGAL <br />This includes all time spent by the Engineer in preparing assessment <br />rolls, preparing depositions, court appearances, litigation and <br />right of any work. <br />D. ADMINISTRATION <br />This includes all time spent by the Engineer in the Administration <br />of grants and loans in work not otherwise necessary except as <br />required by the grantor or lendor. It includes pre - applications, <br />applications, coordination, attendance at meetings, telephone <br />calls, all work associated with public meetings. <br />6 <br />