Laserfiche WebLink
FINAL <br />)a)(tXi)frK3X U N o . 15 <br />Imp 81- 5,6,7,8,9,10 & 11 <br />STREET CONSTRUCTION <br />1. Street Excavation <br />2. Aggr. Base <br />3. Bit. Lev. Course 2331 <br />4. Non -wov Pvmt Fabric <br />5. 2" Bit. Binder Course <br />6. 2" Wearing Course 2341 <br />7. Shouldering CL 2 Aggr <br />8. Sod <br />9. Seed Incl 3" Tpsl <br />1,446 <br />716 <br />151 <br />6,717 <br />910 <br />465 <br />876 <br />C.Y. 4.00 5,784.00 <br />Ton 8.00 5,728.00 <br />Ton 28.00 4,228.00 <br />S.Y. 3.00 <br />S.Y. 3.00 <br />S.Y. 3.25 21,830.25 <br />Ton 12.00 10,920.00 <br />S.Y. 3.00 1,395.00 <br />S.Y. 1.00 876.00 <br />TOTAL STREET CONSTRUCTION. . $ 50,761.25 <br />STREET RESTORATION <br />1. Aggr Base 01 5 <br />2. Bit. Binder Course 2331 <br />3. Bit. Wear. Course 2341 <br />4. Drvwy & Prkg Lot Rest. <br />5. Laid Bit. Curb <br />6. Conc C & G Design D <br />7. Sod Incl 3" Tpsl <br />8. Seed, Mulch 3" Tpsl <br />9. CL 2 Aggr Should 4" <br />2,929.5 <br />969 <br />1,825 <br />6,974 <br />1,485 <br />12,656 <br />13,644 <br />Ton 8.00 23,436.00 <br />Ton 25.00 24,225.00 <br />Ton 28.00 51,100.00 <br />S.Y. 8.00 55,792.00 <br />L.F. 3.00 4,455.00 <br />L.F. 6.00 <br />S.Y. 2.00 25,312.00 <br />S.Y. 0.50 6,822.00 <br />S.Y. 1.00 <br />TOTAL STREET RESTORATION. . $ 191,142.00 <br />MISCELLANEOUS ITEMS <br />1. Pond & ditch Excav <br />2. 18" CMP <br />3. 21" CMP <br />4. 24" CMP <br />5. Soil Stab under MH <br />6. MH Invert Correct <br />7. Gr Adjmt Exist Sewer <br />1,I <br />DEC 9 19E3 <br />CITY OF <br />LITTLE CANADA <br />1,290 <br />98 <br />C.Y. 4.00 5,160.00 <br />L.F. 16.00 1,568.00 <br />L.F. 18.00 <br />L.F. 20.00 <br />4000.00 <br />1750.00 <br />L.F. 20.00 <br />TOTAL MISCELLANEOUS ITEMS . . $ 6,728.00 <br />