My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-12-2013 Council Agenda
>
City Council Packets
>
2010-2019
>
2013
>
06-12-2013 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2014 2:15:00 PM
Creation date
6/10/2013 9:07:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-EL RING • ASSOCIATES <br />TAN ISM <br />June 6, 2013 <br />File No. 120158E -0071 <br />Honorable Mayor and City Council <br />City of Little Canada <br />515 Little Canada Road E. <br />Little Canada, MN 55117 -1633 <br />RE: INTERCEPTOR 01 -LC -421 IMPROVEMENTS <br />PARTIAL PAY ESTIMATE #3 & CHANGE ORDER #1 <br />Dear Council Members: <br />Please find attached 3 copies of Partial Pay Estimate No. 3 and Change Order No.1 for <br />the above - referenced project. As you are aware, the Contractor for the project is Lametti <br />& Sons, Inc. The total amount earned by the Contractor on this partial pay estimate is <br />$409,447.45. Subtracting 5% retainage of $20,472.37 and previous payments of <br />$272,838.10, the amount due the Contractor is $116,136.98. <br />During the lining process it was discovered that there were some bends in the existing <br />48" sanitary line that required small bends be installed in the 12" sanitary sewer line. <br />These bends had to be specially ordered from the manufacturer. It was also decided <br />that the existing pipes north of Keller Parkway should be potholed to determine their <br />exact location and direction so that the new concrete manhole structures could be built <br />correctly. Change Order #1 is for the payment of that work along with providing an <br />extension of the contract time due to difficulties due to the groundwater encountered and <br />is included in this packet for approval by the City Council. <br />This pay estimate includes payment for the completion of the slip lining of the new 12" <br />pipe within the 48" pipe, service connections, and the installation of the 15" PVC sewer <br />by direct bury east of Edgerton Street. The payment also includes the payment of <br />Change Order #1, which was for additional work required by the conditions in the field. <br />We have inspected the work performed by Lametti & Sons and find it to be in <br />compliance with the plans, specifications, and contract documents. Therefore we would <br />recommend approval of Change Order #1 and Partial Pay Estimate No. 3 in the amount <br />of $116,136.98. <br />If you have any questions regarding this issue please feel free to call. <br />Sincerely, <br />ELFERING & ASSOCIATES <br />Lee Elfering, P.E. <br />City Engineer <br />cc: Bill Dircks, Public Works Director <br />Z: \PROD \120158E - MCES Turnback Siip Lining \0071 \Partial Payments \Ltr - 060613 -CC (Payment #3 & CO #1 - Lametti).doc <br />10062 Flanders Court NE, Blaine, MN 55449 - Phone: (763) 780 -0450 - Fax: (763) 780 -0452 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.