My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-12-2013 Council Agenda
>
City Council Packets
>
2010-2019
>
2013
>
06-12-2013 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2014 2:15:00 PM
Creation date
6/10/2013 9:07:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER #1 <br />(Attachment) <br />This contract is amended as follows: <br />WHEREAS: It was determined by the Engineer that the existing pipe locations should be <br />potholed for verification of pipe alignments and angles prior to the construction of <br />the precast manhole structures, and <br />WHEREAS: The Engineer determined that bends in the existing 48" RCP sanitary sewer line <br />would require the use of minor bends in the 12" slipline pipe, and. <br />WHEREAS: The Engineer determined that is would be more cost effective to have the <br />Contractor complete the work as part of the project, and <br />WHEREAS: The Engineer directed the Contractor to complete the work on a time and <br />material basis. <br />NOW, THEREFORE, IT IS HEREBY MUTUALLY AGREED AND UNDERSTOOD THAT: <br />1. The Contractor shall complete the above described changes and additions to the project. <br />2. Payment for the work was reviewed and approved by the Engineer. <br />3. The Contractor will not make claim of any kind or character for any other costs or <br />expenses that he may have incurred or that he may hereafter incur in performing the <br />work or furnishing the materials of this agreement. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.