Laserfiche WebLink
3. Construction Plans: Construction plans shall include detailed <br />working drawings with sufficient sections, elevations and <br />structural details to enable a prospective Contractor to quote or <br />bid a firm price on the work without additional engineering. The <br />Construction Plans shall comprise forty percent (40a) of the basic <br />fee. <br />4. Construction Specifications: Specifications shall be of sufficient <br />scope to enable a prospective Contractor to quote or bid a firm <br />price based on a set standard of quality, performance and <br />procedure. The Specifications shall comprise thirty percent (30%) <br />of the basic fee. <br />B. BASIC FEE SCHEDULE <br />The percentage rates shown below shall be considered full compensation <br />for the Basic Services outlined above, for assisting in the taking and <br />tabulation of bids and for reviewing the bids and submitting a <br />recommendation regarding award (See Section II, Paragraph H on <br />Rebidding): <br />a. Less than $20,000.00 per diem rates <br />b. $20,000.00 to $50,000.00 8.5% <br />c. $50,000.00 to $100,000.00 5.0% <br />d. $100,000.00 to $200,000.00 7.5% <br />e. $200,000.00 to $500,000.00 7.0% <br />f. $500,000.00 to $1,000,000.00 6.0% <br />g. $1,000,000.00 and over 5.5% <br />The percentage rates apply to the lowest responsible bid unless a <br />portion of the work on which Engineering Services were performed is <br />deleted by the Owner prior to the taking of bids. If the latter <br />occurs, the percentage rates shall apply to the low bid and the <br />Engineers shall receive additional compensation for services performed <br />Page 24 <br />