Laserfiche WebLink
4.1. The erosion and sediment control plan must address the <br />following criteria: <br />(1) Stabilization <br />stockpiles; <br />(2) Establishment <br />Protection of <br />(3) <br />of denuded areas and soil <br />of permanent vegetation; <br />adjacent properties; <br />of sediment trapping <br />(4) Timing and stabilization <br />measures; <br />(5) Use of sediment basins; <br />(6) Cut and fill slopes; <br />(7) Stormwater management criteria for controlling <br />off -site erosion; <br />Stabilization of waterways and outlet; <br />Storm -sewer inlet protection; <br />Working in or crossing waterbodies; <br />Underground utility construction; <br />Construction access routes; <br />(13) Disposition of temporary measures; and <br />(14) Maintenance of practices. <br />4.2. Plan. The erosion and sediment control plan must <br />include: <br />(1) Location map with major street and landmarks; <br />(2) Proi.ect description; <br />(3) Property boundary and lot lines; <br />(4) Utility lines; <br />'(5) Existing contours:. <br />Page 45 <br />