My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-24-1988 Council Agenda
>
City Council Packets
>
1980-1989
>
1988
>
02-24-1988 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2013 12:00:17 PM
Creation date
6/12/2013 11:57:56 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 31, 1983 <br />Ramsey County <br />DEPARTMENT OF PUBLIC WORKS <br />3377 North Rice Street <br />Saint Paul, Minnesota 55112 <br />(612) 484 -9104 <br />Mr. AIan Brixius <br />Midwest Associated Consultants, Inc. <br />4820 Minnetonka Boulevard <br />Suite 420 <br />Minneapolis, Minnesota 55416 <br />/Proposed Development <br />County Road C and Stark Street <br />Divisions of: <br />Engineering <br />Maintenance <br />Mobile Equipment <br />Environmental Services <br />The proposed development at the above referenced location proposes a driveway on <br />County Road C which is under the jurisdiction of Ramsey County Public Works. The <br />location shown is in accordance with the standards and guidelines recommended by this <br />department and therefore when the plan is submitted for authorization to construct <br />the entrance as shown and provided all other requirements are met, the entrance should <br />be approved. <br />As an additional recommendation, I urge you to consider the construction of an internal <br />circulation system that could allow full utilization of the parking area provided for all <br />residents of the development. This recommendation is a local issue and therefore for <br />development of this nature would not have a bearing on approval of the entrance <br />construction. <br />Thank you for the opportunity to review the proposed plan. As the plan developes, <br />Ramsey County will require that you request an entrance authorization through the <br />permit process prior to construction. <br />if I can be of further assistance, please call. <br />acAV <br />Paul Kirkwold, P E. <br />Traffic and Planning Engir,i;er <br />PK:m <br />Page 41 EXHIBIT E <br />LETTER FROM COUNTY ENGINEER <br />
The URL can be used to link to this page
Your browser does not support the video tag.