My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-12-2013 Additions
>
City Council Packets
>
2010-2019
>
2013
>
06-12-2013 Additions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2013 8:31:50 AM
Creation date
6/13/2013 8:31:31 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
than October 15, 2013 so that said assessments may be certified for collection with real property <br />taxes beginning in the year 2014. The assessment will be levied in two installments so that it <br />will be paid in full on or before December 31, 2015. As a condition of the City agreeing to <br />assess the cost of the above improvements, the Developer on behalf of itself, its successors and <br />assigns, hereby waives all rights of appeal as set forth in Minn. Stat. § 429.081 and acts <br />amendatory thereof. <br />Engineering <br />20. The Developer shall cause to be constructed, at its cost and its own risk, the <br />Required Improvements according to City standards. All of the Grading and Drainage <br />Improvements shall be approved by the City and shall be consistent with the Final Plat and the <br />Grading, Drainage, Erosion Control Plans dated , subject to any revisions <br />required by the City Engineer. A copy of said plans are attached hereto and incorporated herein <br />as Exhibit E. The Developer also agrees to adhere to all terms and conditions as set forth by the <br />Ramsey - Washington Metro Watershed District (RWMWD) Permit ft 10.02, a copy of which is <br />attached hereto as Exhibit F. <br />21. Developer or their agents or assigns, shall comply with all provisions of' the Storm <br />Water Pollution Prevention Plan (SWPPP) including but not limited to keeping the public streets <br />clear of any soil, earth or debris resulting from work done by Developer or his agents or assigns. <br />Any such materials must be promptly removed and in no event shall they be present more than <br />24 hours after placement. Failure to comply with this provision will result in the City <br />undertaking this work with costs to be reimbursed by Developer pursuant to Paragraphs 12 & 13 <br />of this Agreement. <br />22. The Developer shall cause to be performed to the City Engineer's satisfaction all <br />finish grading, on each lot of the plat and shall maintain said grading until a Certificate of <br />
The URL can be used to link to this page
Your browser does not support the video tag.