Laserfiche WebLink
61 <br />Construction General <br />Manager Contractor <br />Identify Design Interferences x <br />Bid Phase: <br />Prequalification of Bidders x <br />Cash Flow Projections x x <br />Survey Labor Market x x <br />Propose Value Engineering Opt. x x <br />Analyze Bids x x(so) <br />Recommend Contract Awards x <br />Construction Phase: <br />Conduct Preconstruction Meetings x x <br />Obtain Permits x x <br />Administer Contracts x x(so) <br />Control Cost and Schedule x x(so) <br />Manager Owner Furnished Items x <br />Administer Submittals x x <br />Negotiate Change Orders x x <br />Coordinate & Inspect Work x x(so) <br />Arrange for Inspection & Test x x(so) <br />10 <br />