My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-27-1984 Council Agenda
>
City Council Packets
>
1980-1989
>
1984
>
06-27-1984 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2013 3:12:20 PM
Creation date
6/24/2013 3:10:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />ASSOCIATES,1 <br />Consulting Enginors - land Surveyors <br />Si PAUL SAUK CONttf 11. CLOUD <br />- .MINNHOiA- <br />City of Little Canada <br />515 E. Little Canada Rd. <br />St. Paul, Minn 55117 <br />Item No. <br />500 West Highway 96 <br />St. Paul. Minnesota 55112 <br />484-3301 <br />STREETS <br />JUN 20 1984 <br />CITY OF <br />400 E St 6eL4j1 T .E CANADA., Oak Street <br />51 CIou0. Minnesota 56301 Sauk Centre. Minnesota 56378 <br />251-7751 352-3664 <br />v <br />June 18, 1984 <br />RE: Estimate No. FINAL <br />Impr. 81 -3 - Park Ave. <br />Cont: Ro -So Cont. Inc. <br />1. Clearing & Grubbing Lump Sum <br />2. Excavation 5149 C.Y. <br />3. Omit <br />4. Sub -Base Preparation 12.72 Rd. Sta. <br />5. Aggregate Base 4838.40 S•Y• <br />6. Bit. Binder Course 4311.59 S•Y• <br />7. Bit. Wearing Course 4311.59 S.Y• <br />8. Seed & Mulch 3 "Topsoil Ac. <br />9. Sodding 2624; S•Y <br />10 Concrete Curb & gutter 2539 L.F. <br />11 Bit. Driveway Restoration S•Y•131.85 <br />SANITARY SEWER <br />2. OMIT <br />3. OMIT <br />@ 1,500.00 <br />2.75 <br />@ 130.00 <br />2.40 <br />2.50 <br />2.75 <br />@ 2,000.00 <br />1.75 <br />4.25 <br />10.00 <br />$ 1,500.00 <br />$14 159.75 <br />$ 1,653.60 <br />$11 612.16 <br />$10,778.97 <br />$11,856.87 <br />$ 2,000.00 <br />$ 4,592.00 <br />$10,790.75 <br />$ 1,318.50 <br />TOTAL STREETS $70,262.60 <br />4. 4" Ex. Strength CIP 532 L.F. <br />5. OMIT <br />6. OMIT <br />7. Trench Stabilization <br />@ 7.00 $ 3,724.00 <br />996 Ton @ 9.00 $ 8,964.00 <br />WATERMAIN <br />18. 6" DIP Watermain 1046 <br />19. 6x6 CIP Tees 3 <br />20. 6" Gate Vale & Boxes 1 <br />21. Hydrants 2 <br />22. 6" CIP Bends 2 <br />23. 6" CIP Plug 1 <br />24. 1" Type K Copper 558 <br />25. 1" Corp. & Stop 21 <br />26. 1" Curb Stop & Box 19 <br />TOTAL SANITARY SEWER $12,688.00 <br />L.F. <br />Each <br />Each <br />Each <br />Each <br />Each <br />L.F. <br />Each <br />Each <br />4 YOTAL WATERMAIN <br />@ 8.20 $ 8,577.20 <br />@ 185.00 $ 555.00 <br />@ 350.00 $ 350.00 <br />@ 830.00 $ 1,660.00 <br />@ 135.00 $ 270.00 <br />@ 40.00 $ 40.00 <br />@ 5.00 $ 2,790.00 <br />@ 20.00 $ 420.00 <br />@ 65.00 $ 1,235.00 <br />$ 15,897.20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.