My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-09-1989 Additions
>
City Council Packets
>
1980-1989
>
1989
>
08-09-1989 Additions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2013 1:25:51 PM
Creation date
6/26/2013 1:25:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Description of Flood Damage Assessment Process <br />What kind of assessment process has been used or is proposed to be used to <br />evaluate the flooding problem? Has an inventory of flood -prone structures <br />been conducted for the local unit of government or is an inventory <br />proposed? Has there been any citizen participation utilized in identifying <br />the scope of the flooding problem or in developing this application for <br />assistance? Have the Corps of Engineers, Soil Conservation Service, DNR, a <br />local watershed district or an engineering consultant been utilized to <br />assess the flooding problem? <br />3. Description of Alternative Flood Mitigation Measures <br />Please list below and summarize the short -term and long -term flood damage <br />mitigation alternatives that have been considered. Why do you feel the <br />most feasible, practical and effective alternative has been proposed for <br />funding in this application? Is this application for the purpose of <br />identifying alternative flood mitigation measures? <br />4. Description of the Proposed Flood Damage Reduction Measures <br />What measures are being proposed in this application to alleviate flood <br />damages including inventories, studies and non - structural or structural <br />measures? Will this proposed project affect your entire local government? <br />If the proposed project only affects a portion of the local government, how <br />will flood problems in other areas be addressed? Include work plans, maps, <br />schedules, plans, specifications and costs. Be as specific as possible. <br />PAGE -13- <br />
The URL can be used to link to this page
Your browser does not support the video tag.