My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-23-1989 Council Agenda
>
City Council Packets
>
1980-1989
>
1989
>
08-23-1989 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2014 2:24:39 PM
Creation date
6/26/2013 1:25:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TKDA <br />rJ% 7 <br />TOLTZ. KING, OUVALL. ANDERSON <br />AND ASSOCIATES. INCORPORATED <br />ENGINEERS ARCHITECTS PLANNERS <br />August 11, 1989 <br />W. Joseph Chl ebeck <br />City Clerk - Treasurer <br />City of Little Canada <br />515 Little Canada Road <br />Little Canada, Minnesota 55117 <br />Re: 90 -Inch Vadnats Conduit Replacement <br />St. Paul Water Utl l ity <br />Commission No. 9556 <br />Dear W. ail ebeck: <br />2500 AMERICAN NATIONAL BANK BUILDING <br />SAINT PAUL. MINNESOTA 551011893 <br />612/2924400 <br />FAX 612/292-0083 <br />As consulting engineers for the St. Paul Water lit! Itty, we are currently <br />preparing plans and specifications for the replacement and realignment of <br />approximately 2,500 lineal feet of the Utility's 90 -inch diameter water <br />conduit which, together with a similar parallel conduit, conveys water fran <br />Vadnats Lake to the water treatment plant. The portion being replaced is <br />located between Roselawn Avenue and County Road B and between the Soo Line <br />tracks and the Utility's lime sludge lagoon, in Maplewood. <br />As you may be aware, the watermains supplying Little Canada (a 12 -1nch and <br />a 24 -inch) are Installed in the Water Utility's right-of -way northward fran <br />Roselawn Avenue, closely adjacent to the new alignment of the large conduit <br />being replaced. It is Ilkely that the proposed construction will have an <br />adverse effect on the continuity of service to the City during the <br />construction period unless special precautions and /or temporary mains are <br />provided by the contractor to which the conduit replacement project is <br />awarded; an award is anticipated early this fall, with completion of the <br />work scheduled for June 1, 1990. <br />The City's agreements with the Water Uti <br />dated July 13, 1966 and April 19, 1978, <br />responsible for the costs Involved In al <br />question as required to accommodate the <br />rei ovation of the Water Uti I Ity's fact I I <br />I ity for use of the right -of -way, <br />provide that the City will be <br />tering or relocating the mains in <br />alteration, maintenance or <br />ti es. <br />Page 107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.