Laserfiche WebLink
i <br />SSOCIATES,1 <br />Consulting teginooro -fond Surwyero <br />October 9, 1989 <br />CITY OF LITTLE CANADA <br />515 East Little Canada Road <br />Little Canada, MN 55115 <br />FINAL ESTIMATE <br />500 West Highway 96 <br />St. Paul, Minnesota 55126 <br />484 -3301 <br />LITTLE CANADA IMP. 88 -23 <br />CONTRACTOR - Midwest Asphalt <br />6350 Industrial Drive Box 5477 <br />Hopkins, MN 55343 <br />1. Excavation <br />2. Select Granular Material <br />3. Agg. Cl 5A (100% Crushed <br />Limestone) <br />4. Bituminous Base 1}" (2331) <br />5. Bituminous Wearing Course <br />1}" (2341) <br />6. Conc. Curb & Gutter B618 <br />7. Conc. Sidewalk 8'W - 4" <br />8. 24" RCP Cl 5 <br />9. 24" RCP Cl 4 <br />10. 21" RCP Cl 5 <br />11. 18" RCP Cl 4 <br />12. Std. C.B. w /Casting & Cover <br />13. Catch Basin Mn /DOT #4021C <br />14. Std. M.H. w /Casting & Cover <br />15. Remove Existing C.B. <br />16. Grouted Rip -Rap <br />17. Sodding (Inc. 4" topsoil) <br />18. Seeding (Inc. 4" topsoil) <br />19. Trench Stabilization <br />20. Silt Fence <br />21. Tie in Roof Drains to C.B. <br />22. 24" Surge Basin w /Screen <br />Lump Sum $ 4,750.00 <br />989.6 Cu.Yd. 6.95 6,877.72 <br />964.44 Ton <br />243.42 Ton <br />8.56 <br />21.00 <br />212.32 Ton 22.00 <br />957 L.F. 4.75 <br />4,344 Sq.Ft. 1.40 <br />322 L.F. 28.75 <br />563 L.F. 25.65 <br />119.5 L.F. 23.00 <br />58 L.F. 21.00 <br />4 Each 822.00 <br />1 Each 1175.00 <br />1 Each 915.00 <br />Lump Sum <br />15 Cu.Yd. 50.00 <br />3,754 Sq.Yd. 1.85 <br />9,680 Sq.Yd. 0.67 <br />-- Ton 10.00 <br />40 L.F. 3.00 <br />Lump Sum <br />1 Each 1000.00 <br />TOTAL . . . <br />Page 8 <br />8,255.61 <br />5,113.92 <br />4,671.04 <br />4,545.75 <br />6,081.60 <br />9,257.50 <br />14,440.95 <br />2,748.50 <br />1,218.00 <br />3,288.00 <br />1,175.00 <br />915.00 <br />525.00 <br />750.00 <br />6,944.90 <br />6,485.60 <br />120.00 <br />350.00 <br />1,000.00 <br />. $89,514.09 <br />