Laserfiche WebLink
SHERMAN•BOOSALIS <br />December 1.8, 1.989 <br />Mr. Ewald Boise <br />Project. Engineer <br />Miner W. Carley and Associates, Inc. <br />500 West Highway 96 <br />Shoreview, MN 55126 <br />Dear Mr. Beise: <br />RE: CENTRE PLACE - .WATERMAIN <br />LITTLE CANADA, MN ' <br />As we discussed during the construction of the phase one commercial <br />site, 11 would be In the city's and Sherman- iBoosalls company's best <br />interest. to serve Phase tI (Centre Place) concurrently with . Phase I's <br />utilities. This would assure that no parking lot or existing utilities <br />would be disturbed or damaged as the case certainly would have been <br />had you decided to wait until next spring. <br />Attached Is a diagram drawn by Carely and Associates. It illustrates <br />the location of the 6" D.I.P. Class 53 pipe that was Installed Oil the <br />city's behalf. An easement for the watermain Is Indicated the <br />preliminary plat as drawn by Schoen & Madson; Inc. If. you have <br />questions about this phone John :Karwacki with Schoen. & Madson at <br />546- 760].. <br />Perron Contracting was the con tractor responsible for the watormnhi <br />installation. Total price for installation according to' city <br />requirements totals - $13,046.00: Perron Contracting will be invoicing <br />Sherman- Boosalis company and Sherman- Boosaiis' will, in turn send air. <br />Invoice to Carley and Assoc. for approval for payments. If you have <br />any questions, please call me at 332 -3000, Thank you. <br />Sincerely, <br />SHERMAN- BOOS •LIS COMPANY <br />/ /44.4-1-i r <br />Gary Prinsen <br />Construction Manager <br />PER.RONCA:TYPING /js <br />Page .71 <br />4kd/fnq Address: P0. Itus 1182 • Minneapolis, MN 55410 -1482 • S7reel Address: 340 Century l'laza • 1111'11tird Acenne South <br />Minneapolis, MN 55/041010 • (612) 3337272 • Fax Number • (612) 344 -1795 <br />