Laserfiche WebLink
11.2.1 Continued <br />FOR BASIC SERVICES, as described in Article 2, and any other services included in Article 12 as <br />part of Basic Services, Basic Compensation shall be computed as follows: <br />The Architect shall receive hourly compensation not to exceed a fixed maximum based on a <br />percentage of the total cost of construction as included in the architect's work. Hourly rates shall <br />be stated in 14.4.1. The owner will be credited the Part 1, Partial Schematic Design Fee, toward <br />the total project fee. <br />PROJECT 1: Fire Station (New Constructionl <br />-7% of construction + $2,000 maximum for reimbursables (printing and travel) based on <br />actual costs + % for major bid alternates. <br />PROJECT 2: City Hall (Expansion and Remodeling) <br />-8% of construction + $2,000 maximum for reimbursables (printing and travel) based on <br />actual costs + % for major bid alternates. <br />*Major bid alternates would be those requiring a change in construction drawings. <br />Hourly rates for Phase I and II shall be as stated: <br />Hourly Rates <br />David Kroos /Jack Boarman Project Principal $75 <br />Paul Mickelberg Project Manager $54 <br />Jerry DeZelar Project Architect $60 <br />Rick Houts Project Architect $48 <br />Paul Roitenberg Mechanical Engineer $70 <br />Mike McGie Electrical Engineer $60 <br />Vicky Johnson Interior Design $48 <br />Page 85 <br />