Laserfiche WebLink
Owner: <br />City of Little Canada <br />515 East Little Canada Road <br />Little Canada, MN 55117 <br />Contractor: <br />BE CONSTRUCTION, LTD. <br />P. O. Box 219 <br />Lake Elmo, MN 55042 <br />For: <br />Pioneer Park Concession Building <br />2886 Centerville Road <br />Little Canada, MN 55117 <br />Change Order No. <br />1 <br />Date: Junc 25, 1990 (Rev.) <br />Contract Date: May 9, 1990 <br />Architect: <br />RYK Architects <br />355 Kellogg Blvd <br />St. Paul, MN 55101 <br />Contract Date: May 9, 1990 <br />THE CONTRACT FOR CONSTRUCTION SHALL BE CHANGED AS FOLLOWS: <br />Excavate earth, and place fill in area where berm is to be built at $ 1.75 per cubic yard, import <br />fill sand to the site at $ 4.50 per cubic yard, and place and compact fill sand in excavation at $ <br />2.00 per cubic yard. All work as directed by the soils engineer employed by the owner, or where <br />directed by the City of Little Canada. <br />Total Labor & Material Per Cubic Yard: $ 8.25 per cubic yard <br />1. Soil Correction At West Pier: <br />2. Soil Correction At East Pier: <br />3. Sand Cushion Under Sewer Service: <br />4. Sand Cushion Under Water Main: <br />5. Water Main Excavation Oversize: <br />6. Irrigation Pipe Sand: <br />Total Additional Material <br />Extra Subcontract Material: <br />218.50 Cubic Yards @ $ 8.25 <br />Subcontractor's 15 % OH & P <br />Total Extra By Subcontractor <br />10 %OH &P <br />7.20 Cubic Yards <br />13.20 Cubic Yards <br />15.60 Cubic Yards <br />9.60 Cubic Yards <br />118.40 Cubic Yards <br />54.50 Cubic Yards <br />218.50 Cubic Yards <br />$ 1,802.62 <br />$ 2,073. 1 <br />$ 207.3 <br />TOTAL THIS CHANGE ORDER ADD <br />CONTRACT TIME EXTENSION: TWO WORKING DAYS <br />CONTRACTOR: <br />Page 118 <br />1 SD, Zte c1,C <br />PO <br />11 51, %S <br />OWNER: <br />