My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-08-1990 Council Agenda
>
City Council Packets
>
1990-1999
>
1990
>
08-08-1990 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2013 2:24:04 PM
Creation date
7/19/2013 2:21:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IIIII :..APPENDIX'NO. t(CONT'D) <br />LITTLE CANADA - SLUMBERLAND <br />WATER MAIN CONSTRUCTION COST EST. <br />-:.8' LATERAL <br />PART 4 <br />III UNIT- EST. EST. <br />ITEM UNIT PRICE QUANTITY COST <br />MOBILIZATION L.S. $4,000.00 1 $4,000.00 <br />CLEAR AND GRUB L.S. $1,000.00 1 $1,000.00 <br />REMOVE EXISTING PLUG EA. $250.00 2 $500.00 <br />IIII rte. HYDRANT EA. $1,000.00 2 $2,000.00 <br />L.F. $19.00 900 $17,100.00 <br />8" DIP <br />6" DIP L.F. $16.00 30 $480.00 <br />iill B• GATE VALVE AND BOX EA. $500.00 2 $1,000.00 <br />6' GATE VALVE AND BOX <br />BITUMINOUS PATCHING <br />TURF ESTABLISHMENT <br />EA. $350.00 2 $700.00 <br />DIP FITTINGS LBS $1.50 1100 $1,650.00 <br />S.Y. $5.00 40 $200.00 <br />L.F. $4.00 900 $3,600.00 <br />IMPROVED PIPE FOUNDATION L.F. $1.50 900 $1,350.00 <br />I <br />I CLASS 5 BASE, 100 2 CRUSHED TON $6.00 30 $180.00 <br />!III / TOTAL EST. CONSTRUCTION $33,760.00 <br />iill _ + 102 CONTIGENCIES $3,376.00 <br />$37,136.00 <br />+152 DESIGN, INSPECT, ADMIN. $5,570.40 <br />$42,706.40 <br />+52 CAPITALIZED INTEREST $2,135.32 <br />TOTAL ESTIMATED COST $44,841.72 <br />- 11 - <br />- 37205R <br />Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.