Laserfiche WebLink
RE: COUNTRY DRIVE -- St. Paul Water Works to Owasso Blvd. South <br />Construction <br />Contingency <br />Legal <br />Fiscal <br />Administration <br />Engineering <br />Capital Interest <br />TOTAL <br />Initial <br />$289,703.00 <br />28,970.00 <br />17,382.00 <br />17,382.00 <br />(2 %) 5,794.00 <br />52,147.00 <br />$411,378.00 <br />41,138.00 <br />$452,516.00 <br />Carley Revised <br />$368,264.00 <br />36,826.00 <br />22,096.00 <br />22,096.00 <br />(2 %) 7,365.00 <br />66,288.00 <br />$522,935.00 <br />52,294.00 <br />$575,229.00 <br />This estimate does not include cost of easements. <br />Current <br />$370,000.00 <br />37,000.00 <br />15,000.00 <br />11,000.00 <br />(5 %) 18,500.00 <br />(15 %) 55,500.00 <br />$507,000.00 <br />9,500.00 <br />$516,500.00 <br />