My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-26-1990 Additions
>
City Council Packets
>
1990-1999
>
1990
>
09-26-1990 Additions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2013 3:06:45 PM
Creation date
7/19/2013 3:05:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER (Cont'd) <br />Owner: <br />City of Little Canada <br />Contractor: <br />BE CONSTRUCTION, LTD. <br />For: <br />Pioneer Park Concession Building <br />Little Canada, Minnesota <br />Date: 9 -7 -90 <br />Architect: <br />RVK Architects <br />3. Furnish all labor, materials, equipment, and incidentals to <br />install eight (8) Progress P5791- 60- W -P8767 light fixtures, <br />complete with required back boxes, wiring, and lamps. Layout <br />to be provided by architect and /or electrical engineer. <br />A. Fixtures: <br />8 fixtures at $ 47.60 each <br />B Installation: <br />Installation of 8 at $ 35.00 each <br />ADD <br />$ 380.80 <br />$ 280.00 <br />$ 660.80 <br />4. Furnish all labor, materials, equipment, and incidentals to <br />complete the following changes: <br />A. In the Men's and Women's Rooms, connect the light fixtures <br />onto circuit # 42, and disconnect from circuit # 3. <br />B. Disconnect exit lights from circuit # 36, and connect to <br />the light circuit in that area, connect ahead of the light <br />switch. <br />ADD $ 155.00 <br />Total Items No. 1, 2, 3, and 4 <br />Subcontractor 15 % OH & P <br />Subcontractor Total <br />Contractor's 10% OH & P <br />$ 2,788.86 <br />$ 418.33 <br />$ 3,207.19 <br />$ 320.72 <br />TOTAL THIS CHANGE ORDER <br />ADD $ 3,509.91 <br />CONTRACT TIME EXTENSION: Shall be the total number of calendar <br />days from Monday, August 13, 1990, through the date that written <br />authorization is received from the Architect to proceed with this <br />Change Order. <br />CONTRACTOR: ARCHITECT: <br />BE CONSTRUCTION, LTD. RVK A_ ITECTS <br />CANADA <br />2 of 2 <br />Page 16 <br />OWNER: <br />CITY OF LITTLE <br />
The URL can be used to link to this page
Your browser does not support the video tag.