EXHIBIT C - L10 GRAVITY PIPE SYSTEM COST ESTIMATE <br />ITEM MET COUNCIL <br />NUMBER SUMMARY Or WORK TOTAL BID ACTUAL COSTS RESPONSIBILITY CONTINGENCY TOTAL <br />INTERCEPTOR REPAIRS AND MANHOLE REPAIR <br />O (INTERCEPTOR 1•LC•420 JOINT REPAIRSI <br />1,1.0,421 SLIP LINING, ABANDONING. & <br />C REROUTING <br />5369,552.00 5283.31600 50.00 5283,310.00 <br />5436,70000 $442.17845 5442,178.45 520,00600 8467.178.45 <br />ESTIMATED TOTAL CONSTRUCTION COSTS 5745.494.45 <br />E$TIMATED ENGINEERING COSTS (7%) $47.854.25 <br />TOTAL DESIGN & CONSTRUCTION COSTS 8793,346.70 <br />AOMIN COSTS 05% CONSTRUCTION COSTS) 5111.824.17 <br />TOTAL ESTIMATED PROJECT COSTS 5905,172.87 <br />4 <br />