Laserfiche WebLink
TAN- S -92 WED 10:25 SANDER_ AND ASSOCIATES P . 04 <br />PIONEER PARK SITE IMPROVEMENTS - PHASE II CHANGE ORDER NO. 1 <br />UNIT AMOUNT INCREASES <br />QTY UNIT AMT. TOTAL <br />ADD Class 5 Crushed Limestone <br />Complete in Place 98.2 Ton $8.00 $785.60 <br />ADD Ag -lime Infield Touch Up <br />Complete in Place 2.8 Ton $14.00 $39.20 <br />ADD 4" Concrete Surfacing <br />Complete in Place 94 SF $2.50 $235.00 <br />ADD Concrete Curbs <br />Complete in Place 19 LF $7.65 $145.35 <br />ADD Class 5 Gravel Base <br />Complete in Place 9.1 Ton $8.50 $77.35 <br />ADD Tennis Court Windscreen <br />Complete in Place 1 LS $340.00 $340.00 <br />ADD 6" PVC Drainage Pipe <br />Complete in Place 14.5 LF $3.00 $43.50 <br />DELETE 9" Polyethylene Catch Basin <br />Complete in Place 1 EA $57.45 ($57.45) <br />$1,608.5 <br />EXTRA WORK ITEMS <br />Move soil from Centerville Road and <br />spread along south side boundary 1334 CY $3.00 $4,002.00 <br />Spray weed killer to eliminate possibility of weeds <br />penetrating tennis court area 1 LS $125.00 $125.00 <br />Entrance Roadway - Subgrade <br />and install Class 5 limestone <br />1 hr Loader <br />2 hrs Bobcat <br />70.5 Tons <br />$69.00 <br />$47.00 <br />$8.00 <br />$69.00 <br />$94.00 <br />$564.24 <br />Filling of washouts 5 hrs Bobcat $47.00 $235.00 <br />Change of mound contours 3 hrs Loader $69.00 $207.00 <br />Grade parking lot 2 hrs Grader $67.00 $134.00 <br />Replace 35 CY material with topsoil 35 CY $7.00 $245.00 <br />7 LOADS $20.00 $140.00 <br />$5,815.24 <br />TOTAL CHANGE ORDER AMOUNT $7,423.79 <br />Page 24 <br />