Laserfiche WebLink
g. <br />Canada's share is 50 percent. <br />Trunk Highway No. 49 (Rice Street) at Minnesota <br />Avenue. System "G ". S.P. 6214 -63. Remove the <br />existing traffic control signal and install a new <br />traffic control signal with street lights and <br />emergency vehicle pre — emption. <br />1. Traffic Control Signal. Estimated <br />Construction Cost is $83,033.00 which: <br />1) includes State furnished materials <br />(excluding EVP System control and interface <br />equipment) and 2) excludes EVP System <br />materials (cable, detectors and lights). <br />Anticipated Federal —aid share is 90 percent. <br />Anticipated State's share is 5 percent. <br />Roseville's share is 2.5 percent. <br />Little Canada's share is 2.5 percent. <br />2. EVP System. Estimated Construction Cost is <br />$7,598.00 which includes: 1) EVP System <br />materials (cable, detectors and lights) and <br />2) State furnished materials (EVP System <br />control and interface equipment). <br />Roseville's share is 50 percent. <br />Little Canada's share is 50 percent. <br />69107 <br />— 12 — <br />Page 28 <br />