Laserfiche WebLink
14. The County and Roseville shall jointly be <br />responsible for the installation of an adequate electrical power <br />supply to the service pad or pole,and for providing the necessary <br />electrical power for the operation of the street lights on the <br />new traffic control signal installation (System "C "), at the <br />shared costs of 50 percent County and 50 percent Roseville. <br />Roseville shall receive the bill for the installation of the <br />electrical power supply and the monthly electrical bill for the <br />street lights on the new traffic control signal, and invoice the <br />County for 50 percent of the costs. The necessary electrical <br />power for the operation of the traffic control signal <br />installation (System "C ") shall be at the cost and expense of <br />Roseville. <br />15. Upon completion of the work contemplated in <br />Paragraph 4c (System "C ") hereof, responsibility for the new <br />traffic control signal with street lights is as follows: a) It <br />shall be the County's responsibility, at its cost and expense to: <br />(1) relamp the traffic control signal, and clean and paint the <br />traffic control signal, cabinet, and luminaire mast arm <br />extensions; (2) maintain the luminaire on the East side of the <br />intersection, and all its components, including replacement of <br />the luminaire if necessary; and (3) relamp the street light on <br />the East side of the intersection; b) It shall be Roseville's <br />69107 <br />— 19 — <br />Page 35 <br />