Laserfiche WebLink
power supply to the service pads or poles, and upon completion of <br />said revised traffic control signals with street lights <br />installations (Systems "E" and "F ") shall continue to provide <br />necessary electrical power for their operation at the cost and <br />expense of the State. <br />19. Upon completion of the work contemplated in <br />Paragraph 4e and 4f (Systems "E" and "F ") hereof, it shall be the <br />State's responsibility, at its cost and expense to maintain the <br />interconnect and perform all revised traffic control signal and <br />street light maintenance. <br />20. Little Canada shall perpetuate an adequate <br />electrical power supply to the service pad or pole, and upon <br />completion of said new traffic control signal with street lights <br />installation (Systems "G ") shall continue to provide necessary <br />electrical power for its operation at the cost and expense of <br />Little Canada. <br />21. Upon completion of the work contemplated in <br />Paragraph 4g (System "G ") hereof, it shall be Little Canada's <br />responsibility, at its cost and expense, to: (1) maintain the <br />luminaires and all its components, including replacement of the <br />luminaire if necessary; (2) relamp the new traffic control signal <br />and street lights; (3) clean and paint the new traffic control <br />signal, cabinet and luminaire mast arm extensions. It shall be <br />69107 <br />— 21 — <br />Page 37 <br />