My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-09-1992 Council Agenda
>
City Council Packets
>
1990-1999
>
1992
>
12-09-1992 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2013 2:30:05 PM
Creation date
8/8/2013 2:27:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXPAND DESOTO STREET LOT TO THE WEST <br />ADDMONAL PARKING SPACES = 70 <br />ESTIMATED COST: 70 @ $600 /ea = $42,000.00 <br />ADVANTAGES: 1. Easy and economical to construct. <br />2. Reasonably good soil and drainage conditions. <br />3. No tree removal required. <br />4. Convenient to major fields. <br />5. Security and maintenance issues easily <br />monitored. <br />6. Good circulation within parking area. <br />7. Preserves the passive park area to the north. <br />8. Provides most of the projected future parking <br />need for the park. <br />DISADVANTAGES: 1. Minor relocation of the trail is required. <br />2. The future field is reduced to 200, in length. <br />3. It may be difficult to get people to use <br />parking on the Desoto Street side of the park. <br />4. Additional traffic on Desoto Street. <br />5. Large parking lot detracts from the appearance <br />of the east side of the park. <br />Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.