Bonestroo <br />Rosene <br />Anderlik & <br />Associates <br />Engineers & Architects <br />October 20, 1992 <br />City of Little Canada <br />515 Little Canada Rd. <br />Little Canada, MN 55117 <br />Attn: Joel Hanson <br />Re: Costa Lane Cost Update <br />Our File No. 372 <br />Dear Mr. Hanson: <br />Otto G. Bonestroo, PE. <br />Robert W. Rosene. PE' <br />Joseph C. Anderlik. PE. <br />Marvin L. SormaIa. P.E. <br />Richard E. Turner, PE. <br />Glenn R. Cook, PE. <br />Thomas E. Noyes. PE. <br />Robert G. Schunicht. PE. <br />Susan M. Eberlin. C.P.A. <br />'Senior Consultant <br />Howard A. Sanford. PE. <br />Keith A. Gordon, PE. <br />Robert R. Prelerle. F.E. <br />Richard W. Foster. P.E. <br />David 0. Loskota. PE. <br />Robert C. Russek, A.I.A. <br />Jerry A. Bourdon. P.E. <br />Mark A. Hanson. P.E. <br />Michael T Rautmann, P.E. <br />Ted K. Field. PE. <br />Thomas R. Anderson. ALA. <br />Donald C. Burgardt. PE. <br />Thomas E. Angus. PE. <br />Ismael Martinez, P.C. <br />Michael P Rau. PE. <br />Agnes M. Ring. A LC P. <br />Thomas W Peterson. PE. <br />Michael C. Lynch. PE. <br />James R. Maland. PE. <br />Jerry 0. Penzsch. P.E. <br />Kenneth P Anderson. PE. <br />Mark R. Rolfs. PE. <br />Mark A. Seip, P.E. <br />Gary W Morten, P.C. <br />Dame! J. Edgerton, PE. <br />Daryl K. Kirschenman, PE, <br />Philip J. Caswell. P.E. <br />Mark D. Wallis, P.C. <br />Miles B Jensen. P.C. <br />L. Phillip Gravel III. PE. <br />Karen L. Wiemeri, PE. <br />Gary D. Knstofitz. PE. <br />F Todd Foster P.E. <br />Keith R. Yapp, PE. <br />Shawn D. Gustafson, PE. <br />Cecilio Olivier. PE. <br />Charles A. Erickson <br />Leo M, Pawelsky <br />Harlan M. Olson <br />James F. Engelhardt <br />7 OCT 21 1992 <br />\- RECEIVED <br />We have prepared a revised cost estimate for street, storm sewer, sanitary sewer and water <br />main for the Costa Lane Street and Utility Improvement Project. This project is addressed <br />within the Desoto Street Preliminary Report as Phase II of a three (3) phase development of <br />Costa Estates. <br />The estimated costs of the work presented in this report have been itemized in the Appendices <br />at the back of this report. The cost estimates include construction, contingency items, design, <br />inspection, administration and capitalized interest costs. The total estimated project cost for <br />Costa Lane street and utility improvements is $239,380 22 <br />The project will be completed as a City project under the Chapter 429 process and will be <br />combined with other City projects being completed in the area so as to benefit from an <br />"economy of scale ". <br />The number of lots and cost per lot may vary depending upon the manner in which Desoto <br />Street Improvement costs are to be recovered. Street and utility stubs were extended up Costa <br />Lane as part of the Phase I improvement at a project cost of $52,340.07 ($4,758.19/lot for 11 <br />lots). For purposes of this report, the assessment rate per lot is based upon project work <br />remaining. Project costs are estimated to be $10,407.84 per lot based on a total of 23 lots. <br />We would like to bring to your attention the fact that lot 3 of the original plat, located on the <br />north end of the project, will have street and utility access upon completion of the Costa Lane <br />Project. In addressing a similar situation, the developer proposes to retain a 4 foot wide strip <br />of land adjacent to lots 12, 13, and 14 of the original plat. In this way, no assessments will be <br />levied against these lots thereby avoiding the need to deal with deferred costs. Access of Lot <br />3 onto Costa Lane should be addressed by the developer in a similar manner prior to finalizing <br />the plat. <br />372.cor <br />Page 1. <br />Page 4 <br />2335 West Highway 36 • St. Paul, Minnesota 55113 • 612 - 6364600 <br />