Laserfiche WebLink
1. PIONEER PARK/WEST SIDE DESOTO STREET <br />QTY DESCRIPTION <br />B 20 Austrian Pine <br />MV 10 FaIlgold Black Ash <br />MV 10 Pin Oak <br />MV 10 Redmond Linden <br />MV 10 Amur Maple -Clump <br />SIZE <br />UNIT IN -KIND <br />COST MATERIAL LABOR TOTAL <br />4' ht. BB $52.50 $1,050.00 $349.97 $1,399.97 <br />2" cal. BB $89.00 $890.00 $296.64 $1,186.64 <br />2" cal. BB $99.00 $990.00 $329.97 $1,319.97 <br />2 " cal. BB $80.00 $800.00 $266.64 $1,066.64 <br />5' ht. BB $55.00 $550.00 $183.32 $733.32 <br />$4,280.00 $1,426.52 $5,706.52 <br />Funding: Grant = $2,853.27 (50 %) In -Kind = $1,426.54 (25 %) City Funds = $ 1426.73 (25 %) <br />2. WESTWINDS PARK /SOUTH PROPERTY LINE <br />QTY DESCRIPTION <br />SIZE <br />B 70 Colorado Green Spruce 4' ht. BB <br />MV 40 River Birch 8' ht. BB <br />UNIT IN -KIND <br />COST MATERIAL LABOR TOTAL <br />$52.25 $3,657.50 $1,219.04 $4,876.54 <br />$65.00 $2,600.00 $866.58 $3,466.58 <br />$6,257.50 $2,085.62 $8,343.12 <br />Funding: Grant = $4,171.56 (50 %) In -Kind = $2,085.62 (25 %) City Funds = $2,085.94 (25 %) <br />Page 24 <br />