Laserfiche WebLink
CONSTRUCTIONCOST UPDATE <br />1993 STREET & UTILITY IMPROVEMENTS <br />MARCH 24, 1993 <br />PRELIMINARY ENGINEER BID <br />ESTIMATE ESTIMATE AMOUNT <br />Edgerton Water Main <br />Vanderbie /Allen <br />Street <br />Storm Sewer <br />Water Main <br />Costa Lane <br />Street <br />Sanitary Sewer <br />Water Main <br />Nadeau Road <br />Total Estimated Construction: <br />$350,020 $332,303 <br />306,140 278,800 <br />55,544 47,696 <br />86,870 104,460 <br />448,554 430,956 <br />112,728 108,466 <br />27,220 32,620 <br />32,765 33,020 <br />172,713 174,106 <br />35,660 29,903 <br />S1,006,947 <br />$298,801.00! <br />242,733.25 <br />44,441.00 <br />95,696.00 <br />$967,268 <br />ESTIMATED TOTAL COST <br />93,689.75 <br />32,244.55' <br />31,082.50' <br />57,016.80' <br />28,329.15: <br />$867,017.20 <br />EDGERTON VANDERBIE/ <br />WATERMAIN ALLEN <br />COSTA NADEAU <br />LANE ROAD '. <br />Construction Costs <br />+Contingency 5% <br />+Engineering & Admin. 20% <br />+Fiscal /Cap. Int. 7% <br />Initial Estimate <br />298,801.00 382,870.00 <br />14,940.00 19,144.00 <br />62,748.00 80,403.00 <br />26,354.23 33,769.00 <br />402,843.23 516,186.00 <br />485,127.00 621,696.00 <br />157,017.00 <br />7,851.00 <br />28,329.00 <br />1,416.00 <br />32,974.00 5,949.00 <br />13,849.00 <br />211,691.00 <br />2,39900 <br />.38093:(')0 <br />381 °,3 <br />239,380.00 49,425.00 <br />ap:gb•:yens. Irak w..u::y::n,.yF. <br />Note: Initial estimated total cost was $1,395,628. Revised estimated cost <br />is $1,168,813. The difference is — $226,815. <br />PAGE 3 <br />