My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-14-1993 Council Agenda
>
City Council Packets
>
1990-1999
>
1993
>
07-14-1993 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2013 2:29:42 PM
Creation date
8/28/2013 2:28:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 25, 1993 <br />LITTLE CANADA ROAD STORM SEWER IMPROVEMENTS <br />OUR FILE NC. 37217 <br />UNIT EST. EST. <br />ITEM UNIT PRICE QUANTIT COST <br />12" RCP STORM SEWER L.F. 320.00 32 3340.00 <br />15" RCP STORM SEWER L.F. 522.00 42 $924.00 <br />18" RCP STORM SEWER L.F. 526.00 232 $6,032.00 <br />18" RCP FLARED END SECTION EA. 350 1 $350.00 <br />TYPE 11 CATCH BASIN EA. 5800.00 1 3800.00 <br />CATCH BASIN MANHOLE EA. 31,000.00 5 $5,000.00 <br />IMPROVED PIPE FOUNDATION L.F. 52.00 306 3612.00 <br />RIP RAP C.Y. $40.00 4 3160.00 <br />FIBER BLANKET C.Y. 320.00 2 $40.00 <br />SOD S.Y. 32.00 400 3800.00 <br />SEED AC. $2,000.00 0.3 5600.00 <br />REMOVE CURB AND GUTTER L.F. 52.00 ' 50 $100.00 <br />CONCRETE CURS AND GUTTER L.F. 38.00 50 3400.00 <br />AGGREGATE BASE TON $8.00 80 $640.00 <br />BITUMINOUS PATCH TON 550.00 30 31,500.00 <br />COMMON EXCAVATION C.Y. 35.00 50 3250.00 <br />GRADING L.S. 52,000.00 1 32,000.00 <br />+10% CONTIGENCIES <br />$20,848.00 <br />$2,084.80 <br />$22,932.80 <br />+25% DESIGN, INSPECT, ADMIN $5,733.20 <br />+5% CAPITALIZED INTEREST <br />328,666.00 <br />51,433.30 <br />TOTAL PROJECT COST $30,099.30 <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.