My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-11-1993 Council Agenda
>
City Council Packets
>
1990-1999
>
1993
>
08-11-1993 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2013 11:19:17 AM
Creation date
9/5/2013 11:18:13 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Rehabilitated Urban Streets: <br />Residential and Commercial - Rehabilitated streets <br />shall be assessed 100% to the affected properties, <br />including any cost associated with installation or <br />repair of curb and gutter. Any costs associated <br />with improvements to the storm sewer system will <br />be borne by the City. (The Modified Assessment <br />Rate shall apply.) <br />4. Reconstructed Urban Streets: <br />Residential - When an urban street is <br />reconstructed, 85% of the project costs shall be <br />assessed to the abutting property owners based <br />upon an 8 "/3" section assuming the street in <br />question has met or exceeded its expected useful <br />life. In the event that the estimated useful life <br />has not been met, a credit will be granted <br />pursuant to the unexpired term. Any credit to be <br />granted will be done at the sole discretion of the <br />City pursuant to its determination. (The Modified <br />Assessment Rate shall apply.) <br />5. Preventive Maintenance: The City shall perform routine <br />and regular preventive maintenance to the extent <br />practical on all streets in the City, until such time <br />as the street has aged or deteriorated to the extent <br />that such maintenance is no longer cost effective. <br />When the City has determined a street has surpassed its <br />useful life, no additional preventive maintenance shall <br />be performed. The only work performed will be the <br />minimum amount necessary to keep the street reasonably <br />safe for vehicular traffic. <br />All preventive maintenance shall be funded by the City <br />for streets where preventive maintenance is cost <br />effective. On deteriorated streets, no preventive <br />maintenance shall be performed except at the sole <br />expense and request of the adjoining property owners. <br />6. Assessment rates will be determined on an annual basis <br />by the City Council for each cycle of projects. The <br />rates may be based on factors such as assessment <br />formulas contained in this policy, appraisal <br />recommendation, construction costs, construction cost <br />indexes, and the advice of City staff. <br />7. In the event trunk line improvements for storm drainage <br />are made as part of a street improvement project, the <br />City's determination of the portion of costs <br />attributable to an undeveloped parcel may be assessed <br />to that parcel in order to avoid a City subsidy to the <br />development. <br />-7- <br />Page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.