My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-24-1993 Council Agenda
>
City Council Packets
>
1990-1999
>
1993
>
11-24-1993 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2013 2:06:22 PM
Creation date
9/5/2013 2:04:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Roads, driveways, and parking areas must meet <br />shoreland setbacks and must not be placed within <br />bluff and shore impact zones, when other reasonable <br />and feasible placement alternatives exist. If no <br />alternatives exist, they may be placed within these <br />areas, and must be designed to minimize adverse <br />impacts. <br />3. Public and private watercraft access ramps, <br />approach roads, and access - related parking areas <br />may be placed within shore impact zones provided <br />the vegetative screening and erosion control <br />conditions of this sub -part are met. For private <br />facilities, the grading and filling provisions of <br />Section 9.4.B of this Ordinance must be met. <br />D. Storm Water Management: <br />1. When possible, existing natural drainageways, <br />wetlands, and vegetated soil surfaces must be used <br />to convey, store, filter, and retain stoLm water <br />runoff before discharge to public waters. <br />2. Development must be planned and conducted in a <br />manner that will minimize the extent of disturbed <br />areas, runoff velocities, erosion potential, and <br />reduce and delay runoff volumes. Disturbed areas <br />must be stabilized and protected as soon as <br />possible in accordance with Best Management <br />Practices. Facilities or methods shall be used to <br />retain sediment on the site. <br />3. When development density, topographic features, and <br />soil and vegetation conditions are not sufficient <br />to adequately handle storm water runoff using <br />natural features and vegetation, various types of <br />constructed facilities such as diversions, settling <br />basins, skimming devices, dikes, waterways, and <br />ponds may be used. Preference must be given to <br />designs using surface drainage, vegetation, and <br />infiltration rather than buried pipes and man -made <br />materials and facilities. <br />4. When constructed facilities are used for storm <br />water management, documentation must be provided by <br />a qualified individual that they are designed and <br />installed consistent with the field office <br />technical guide of the local soil and water <br />conservation districts. <br />13 <br />Page 57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.