My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-27-1993 Council Agenda
>
City Council Packets
>
1990-1999
>
1993
>
10-27-1993 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2013 2:20:53 PM
Creation date
9/5/2013 2:18:43 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n Ronestroo <br />Owner <br />City of Little Canada, 515 Little Canada Rd, L. Canada, MN 55117 <br />Date October 6, 1993 <br />30. â– Rosene <br />^"o`rik a <br />11 Associates <br />i flof,ce...".`7r* <br />Contractor <br />P.M. Frattalone Excavating, 3066 Spruce St, St. Paul, MN 55117 <br />Change Order No. 1 <br />Bond Co. <br />CHANGE ORDER NO. 1 <br />1993 Utility & Street Improvements: <br />Edgerton St., Vanderbie /Allen St., Costa Estates, & Nadeau Rd. <br />Project No. 92 -3, 92 -10, 92 -11, 92 -14 <br />File No. 37213 <br />Description of Work <br />Part A - Edgerton St (Project No. 92 -3) Item 1 This item provides for the connection of new water services with the existing <br />service at the property line on Edgerton Street. <br />Part B - Vanderbie /Allen St (Project No. 92 -10) Part B of this change order provides for street, water main and sanitary sewer <br />improvements. Streets - Items 2 & 3 These items allow for the placement of 1 foot of granular borrow beneath the proposed road <br />section for Allen Avenue from Station 0 +40 to Station 6 +50. The granular borrow is neccessary to counter the instability of the <br />existing subgrade soils in the area. Water Main - Item 4 This item provides for connection of new water services with the existing <br />service at the property line. Sanitary Sewer - Item 5 This item allows for point excavations to repair the existing sanitary sewer. <br />Restoration - Items 6 & 7 These items allow for the.rcmoval and replacement of concrete driveways. <br />Part C - Costa Estates (Project No. 92 -111 Part C provides for the relocation of the existing hydrant along Desoto Street just south <br />of Costa Lane North. The hydrant was relocated to a lot line. <br />No. Item <br />Change Order No. 1 <br />Part A - Edgerton <br />Unit <br />Contract Unit 'Total <br />Quantity Price Amount <br />1 Water service connection EA 17 75.00 1,275.00 <br />Total Part A - Edgerton $1,275.00 <br />Part B - Vanderbie /Allen <br />2 Common excavation CY 976 520 5,07520 <br />3 Granular borrow CY 1,269 6.88 8,730.72 <br />4 Water service connection EA 9 75.00 675.00 <br />5 Point excavation EA 5 450.00 2,250.00 <br />6 Remove concrete surface SF 1,092 0.25 273.00 <br />7 Concrete driveway replacement SF 1,092 2.60 2,839.20 <br />Total Part B - Vanderbie /Allen $19,843.12 <br />37213.CIIA <br />CO -1 <br />Page 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.