Laserfiche WebLink
EXHIBIT 15 <br />PRELIMINARY COST ESTIMATE <br />ARKWRIGHT- SUNRISE AREA STREET IMPROVEMENTS <br />PRELIMINARY COST ESTIMATE <br />STREET AND UTILITY IMPROVEMENTS <br />MAPLEWOOD CITY PROJECT NO. 12 -09 <br />Item <br />Description <br />Unit <br />Estimated <br />TOTAL <br />Unit <br />Price <br />EST. <br />QTY. <br />EST. <br />COST <br />STREET ITEMS <br />2021.501 <br />27701...0.6. <br />2101.6506 <br />2101 507 <br />....... <br />210044.5001 1 <br />..4.. <br />21004.5505 05 <br />... <br />2104.505 <br />2104.505 <br />2704.511 <br />...4..5111. <br />2104 5513 3 <br />2105.501 <br />2105.507 <br />. ..... ........ <br />2105.522 <br />2105 526 <br />_ ........ <br />2705.604 4 <br />.............. <br />2123 610 <br />............. <br />21307 <br />2211.501 <br />2217 501 <br />.............. <br />1.211.5001 <br />....... <br />2232 603 3 <br />2331.603 <br />603...... <br />._......_ <br />2340.508 <br />..1.,_.... <br />2340 574 4 <br />........ <br />2340 521 1 <br />2357.502 <br />...,....... . <br />2411 6118 <br />2531 501 <br />2531 507 <br />2531 507 <br />07....... <br />2531.532 <br />.......... <br />........... <br />2540.602 2 <br />..1....... <br />2563 6007 <br />2573.502 <br />.............. <br />2573 601 <br />2573.602 <br />._....... <br />2575.523 <br />2575 532 <br />2575.604 <br />...04_..... <br />... <br />2340.XXXXXXXX <br />MOBILIZATION <br />CLEARING ANN ...... .....I....... .. ... .................._..... <br />CLEARING GRUBBING <br />.L,.... ... .I_ . .... .... . .......... .............._.. . ......,...._ ...._.., <br />CLEARING ANC) GRUBBING <br />AND . ................. ..............., ............ ...... <br />REMOVVE E CONCRETE CURRB B A GUTTER <br />EBTU BITUMINOUS PAVEMENT <br />............... ......._.. .. ... -.. <br />REMOVE BITUMINOUS DRIVEWAY VEME <br />_., ECON DRIVEWAY „ ENT . .....L....,. .......... .... ....... .... <br />REMOVE CONCRETE DRIVEWAY PAVEMENTIAPRONANALK <br />D N SA ... ....... ....... <br />REMOVE BITUMINOUS ROADWAY PAVEMENT (INCLUDES ANY BIT CURB) <br />CONCRETE PAVEMENT ER._. N ........ <br />SAW CONCRETE PAVEMENT (INCLUDES CURB & GUTTER, DRIVES, AND WALKS) <br />.....IN. I WA.. _.._,...,.,, ....... ........ ... ......................... <br />SAW BITUMINOUS DRIVEWAY PAVEMENT <br />.... ._........ ................ - ........._.. ................. ............ <br />COMMON N EXCAVATION AVATION (P) <br />SUDGRADE EXCAVATION. EV <br />SELECT GRANULAR BORROW, CV <br />SELECT TOPSOIL BORROW. LV <br />GEOTEXTILE FABRIC TYPE V (SUDCUT) <br />SWEEPER ..-.I. ... ............ ............... .......... <br />STREET EPER WITH H PICKUP BROOM <br />WATER FOR DUST CONTROL <br />..__... . ..... STREETS <br />.. ............... .. ..._............ ......... <br />AGGREGATE E BASE CLASS S 6 FOR STREETS <br />..... . .... ... .. ............... .............. <br />ADDITIONAL L AGGREGATE BASE FOR CLASS 6 FOR STREETS <br />AGGREGATE ASS.. 6.. EW_... .......N..... .................. ............. <br />AGGREGATE BASE CLASS 6 FOR DRIVEWAYS TRAILS AND WALKS <br />T MN. CE, T......... 1.8.... - ................ ........ <br />MILL BITUMINOUS SURFACE, t v' DEPTH © MINIMUM 10" WIDE <br />.. US . . .. CONTROL J. WAD.. .............. <br />BITUMINOUS ROAD PAVEMENT CONTROL JOINT SAW AND SEAL <br />TYPE LV3 WEARING COURSE MIXTURE (8) <br />.... ... .............. .............. ....__......_ <br />TYPE LV3 NON-WEARING COURSE E MIXTUURRE (8) <br />....... <br />TYPE LV4 WEARING COURSE MIXTURE (L). 3-INCH Tf IICKFKFOR DWYS AND D TRAILS <br />.. I . . ......... ..... _.......... .........,...., ............ <br />BITUMIN OUS MAT ERIAL FOR TACK COAT <br />. ..... <br />ENGINEERED MODULAR R BLOCK ... ... . ....,......._...._ ........... ....._.. <br />OCK RETAINING WALL <br />...E.... .. 624.. ,. ................ ....... ....... <br />CONCRETE C &G DESIGN 6612 8618 B624, RIBBON OR TRANSITION <br />CONCRETE I, AL .. ,. <br />4 -INCH CNCRE SIDEWALK (INCL. 4" GRAVEL BASE) <br />.. .. ........ ... .. ..I........ .._..... ......_. -.. <br />6-INCH CONCRETE DRIVEWAY PAVEMENT, RESIDENTIAL <br />TRI. .. .. .......... ................ ............. -. ... _.... - ...... <br />PEDESTRIAN AN CURB RAMP <br />.,. ..., .. ..........._.. .... ....................... <br />REINSTALL. MAILBOX SUPPORT (SALVAGED) <br />TRAFFIC CONTROL <br />SILT FENCE, <br />E.,. TYPE HEAVY __.. DUTY <br />.............. ........................ <br />... .. .. .. A,.... ... .. ........ .__ ....... ........ <br />EROSION CONTROL CONTRACTOR'S PLAN <br />HAN ..I.NRO. ENTRANCE . E._..PL. ............ .......... ... <br />FURNISH AND MAINTAIN ROCK ENTRANCE PAD AS PER PATE 350 <br />...NCO. BLANKET, CATEGORY ...... ............ ..... <br />EROSION CONTROL BLANKET CATEGORY 2 <br />.... . S. 20.0.10/10-0-20 .._ .. . /.. . .. ......, X.. 2.0 <br />COMM. FERT., ANALYSIS FOR SODDED/SEEDED AREAS W/ MIX 270 <br />...G,..T LAWN INCL N 0........ .. LB/AC) <br />........ .. .......... <br />SODDING TYPE LAWN (INCLUDING 270RT SEED @ 30 LB /AC) <br />..I A .. ... .. ........... - ........... ............... ........ <br />PRIVATE DRIVEWAY UPDGRADC-S <br />LS <br />EACH <br />ACRE <br />LE <br />SY <br />SY <br />SY <br />LF <br />LF <br />CY <br />CY._. <br />CY <br />CY <br />SY ... <br />.............. <br />IiOUR <br />M GAL <br />TON <br />TON <br />TO1 <br />LF <br />LF <br />ON <br />TON <br />SY <br />GAL <br />SF <br />LF <br />SF <br />SY <br />EACH <br />EACH <br />LS <br />LF <br />LS <br />EACH <br />SY <br />LB <br />SY <br />LS <br />$150,000.00 <br />8300 <br />. . . . 300 . . <br />$.000 0 <br />$5,000.00 00 <br />_.........,.... <br />$33.000 0 <br />.....- ._.,_... <br />$3.00 <br />.. _....... ...0. <br />$55.00 <br />.........$7.50 <br />34 <br />. . . . . . . . <br />$4.50 <br />....._ - ..5_.._.. <br />$3.00 <br />$10 <br />.............. <br />510;000 0 <br />88.00 <br />514 <br />..- ..........0 <br />$14.000 <br />515.00 <br />..... .......... <br />$7.75 75 <br />... <br />......... .... <br />..... <br />$12255.000 0 <br />....._ <br />$500;00 0 <br />.. ...._. .... <br />311.50 <br />$11.50 0 <br />1..5 <br />$14 <br />..........514.00 0 <br />............ <br />..... . <br />.... -.. $44.50 0 <br />31.70 <br />........ -... 370.00 <br />370.00 <br />....._.._..1. <br />318.00 <br />... <br />$2 <br />........$2..225 5.. <br />................. <br />335,00 <br />$11 <br />.............311..0.. <br />.00 0 <br />$5.00 <br />.......- $411.00 .00 <br />5600 <br />. . . . .. . 600 . . . <br />_..- ...8;00 0 <br />5130.00 <br />520.... ,00_ .. <br />$200.00 00 <br />... ......... $1.65 <br />0... <br />310,000.00 <br />5 <br />......1.,00....0. <br />51,1100.00 <br />.._ <br />$ <br />....2..0. <br />............ $2;000 <br />$0.55 <br />5 <br />.....................3,00 3..00 <br />...................5 <br />325,000.00 <br />1.00 <br />100.00 <br />1.50 <br />1,400.00 <br />2,103.56 <br />3,092.67 <br />35,165.78 <br />1,320.00 <br />1,160.00 <br />13,233.15 <br />8,392.22 <br />6,173.33 <br />3,858.26 <br />9,260.00 <br />200.00 <br />460.00 <br />16,893.19 <br />2,825.28 <br />1,659.00 <br />600.00 <br />10,439.33 <br />$150,000.00 <br />$30,000.00 <br />$7,500.00 <br />$4,200.00 <br />56,310.67 <br />$15,463.33 <br />$52,748.67 <br />$5,940.00 <br />53,480.00 <br />$132,331.48 <br />$67,137.78 <br />586,426.67 <br />$57,873.96 <br />516,205.00 <br />$25,000.00 <br />$23,000.00 <br />5194,271.72 <br />532,490.74 <br />$23,226.00 <br />$2,700.00 <br />$17,746.87 <br />2,979.25 <br />4,022.19 <br />2,104.44 <br />1,748.78 <br />250.00 <br />22,386.00 <br />1,500.00 <br />3,095.56 <br />4.00 <br />152.00 <br />1.00 <br />3,590.00 <br />1.00 <br />6.00 <br />5,675.00 <br />1,434.91 <br />34,724.72 <br />1.00 <br />$208,547.50 <br />$281,553.22 <br />$37,880.00 <br />$3,934.75 <br />$8,750.00 <br />$246,246.00 <br />57,500.00 <br />5126,917.78 <br />$2,400.00 <br />$19,760.00 <br />$20,000.00 <br />$8,641.50 <br />$10,000,00 <br />$6,600.00 <br />511,350.00 <br />5789.20 <br />5104,174.17 <br />$25,000.00 <br />STORM SEWER <br />..... &D FST.. SEWER PI.. ...176 & TYPE) <br />2104 501 REMOVE &DISPOSE OF STORM SEWER PIPE (ANY I <br />... ...... . .. <br />2104.509 REMOVE/ABANDON DRAINAGE STRUCTURE & SALV. CSTG. (CB, MH OR R CB -MH) <br />2451,603 AGGREGATE PIPE FOUNDATION PER STANDARD PLATE NO. 440 & 540 <br />........ .- W..... .......,._ ..........., _ ........ ............_. <br />2502 55441 4" PERE DRAIN TUBING W! GEO./ROCK <br />RRUOOH HDPE 12 CORRUGATED SMOOTH WALL HDPE PIPE SEWER <br />51......,. CORRUGATED HOPE E ............. .....- ..........- ............, <br />2503.511 t5" CORRUGATED SMOOTH WALL HOPE PIPE SEWER <br />...-........ .....- .... ........... .......... ............... <br />2503.511 18 CORRUGATED SMOOTH WALL HDPE PIPE SEWER <br />50 <br />TOTAL <br />$2,082,096.99 <br />LF <br />EACH <br />LF <br />LF <br />LF <br />.......... <br />LE <br />LF.,.. <br />lF <br />9.00 <br />300.00 <br />8.00 <br />5 <br />..,....... <br />.00 <br />22.00 <br />25 <br />.__. <br />zs.0o <br />28.00 <br />490.00 <br />17.00 <br />54,410.00 <br />55,100.00 <br />450.00 <br />10,000.00 <br />783.00 <br />2,555.00 <br />1,840.00 <br />$3,600.00 <br />$50,000.00 <br />$17,226.00 <br />$63,875.00 <br />$51,520.00 <br />EXHIBIT 15 <br />