Laserfiche WebLink
March 31, 1994 <br />PART 2 - COUNTRY DRIVE STREET RECONSTRUCTION <br />COST ESTIMA 1'E <br />ITEM <br />UNIT EST. <br />EST. <br />UNIT PRICE QUANTITY COST <br />MOBILIZATON <br />TRAFFIC CONTROL <br />RECLAMATION OF BIT. SURFA <br />SUBGRADE EXCAVATION <br />CLASS 5 AGGREGATE BASE <br />TYPE 31 BITUMINOUS BASE <br />TYPE 31 BITUMINOUS BINDER <br />TYPE 41 BITUMINOUS WEAR <br />AC -1 BIT. MA'T'ERIAL FOR MIXT <br />BITUMINOUS TACK <br />6" BITUMINOUS BERM CURB <br />COMMON BORROW <br />TOPSOIL BORROW (L.V.) <br />SOD <br />SILT FENCE <br />L.S. <br />L.S. <br />S.Y. <br />C.Y. <br />TON <br />TON <br />TON <br />TON <br />TON <br />GAL. <br />L.F. <br />C.Y. <br />C.Y. <br />S.Y. <br />L.F. <br />$2,500.00 <br />$4,000.00 <br />$2.00 <br />$8.00 <br />$7.00 <br />$18.00 <br />$18.00 <br />$20.00 <br />$140.00 <br />$1.50 <br />$4.00 <br />$3.00 <br />$8.00 <br />$2.00 <br />$3.50 <br />1 <br />1 <br />1650 <br />50 <br />400 <br />320 <br />160 <br />160 <br />40 <br />200 <br />450 <br />100 <br />100 <br />500 <br />500 <br />$2,500.00 <br />$4,000.00 <br />$3,300.00 <br />$400.00 <br />$2,800.00 <br />$5,760.00 <br />$2,880.00 <br />$3,200.00 <br />$5,600.00 <br />$300.00 <br />$1,800.00 <br />$300.00 <br />$800.00 <br />$1,000.00 <br />$1,750.00 <br />TOTAL EST. CONS 1RUCTION <br />+ 10% CONTINGENCIES <br />+20% DESIGN, INSPECT., ADMI <br />+ 5% CAPITALIZED INTEREST <br />TOTAL ESTIMATED COST <br />$36,390.00 <br />$3,639.00 <br />$40,029.00 <br />$8,005.80 <br />$48,034.80 <br />$2,401.74 <br />$50,436.54 <br />Page 146 <br />