Laserfiche WebLink
PROPOSED FEE SCHEDULE CONTINUED <br />CITY OF LITTLE CANADA <br />PROPOSED MECHANICAL PERMIT FEE SCHEDULE <br />25.00 + SURCHARGE MINIMUM PERMIT FEE <br />10.00 GAS PIPING - $500.00 valuation or less (repair or installation). <br />4.00 Each additional $500.00 cost of repair or installation. <br />GAS OR OIL FIRED FURNACES OR BOILERS <br />20.00 First 100,000 BTU input or less. <br />3.00 Each additional 100,000 input or fraction thereof. <br />WARM AIR OR HOT WATER HEATING SYSTEM <br />25.00 First 100,000 BTU input for construction or alteration of any <br />'warm air furnace duct work per unit. <br />4.00 Each additional 100,000 BTU input or fraction. <br />25.00 First 100,000 BTU input per unit for construction or alteration <br />of each hot water system per unit. <br />4.00 Each additional 100,000 BTU input or fraction. <br />25.00 First 100,000 BTU input per unit for installation or replacement <br />of each hot water system per unit. <br />4.00 Each additional 100,000 BTUs or fraction thereof. <br />15.00 Per unit on unit heaters, based on first 100,000 BTU input. <br />3.00 Each additional 100,000 BTU input or fraction thereof. <br />AIR CONDITIONING <br />20.00 First 5 tons (60,000 BTUs) of air conditioning per unit. <br />25.00 First 5 tons (60,000 BTUs) of cooling for duct work for <br />air conditioning. <br />3.00 Each ton (12,000 BTUs) or fraction thereof over first 5 tons <br />for duct work for air conditioning <br />25.00 Wood Burning Furnace per unit <br />25.00 Swimming Pool Heater per unit <br />20.00 Air exchanger with duct work per unit <br />20.00 Gas or oil spacer heater per unit <br />20.00 Gas direct vent heater per unit <br />20.00 Gas fireplace log or heater per unit <br />Portions adapted from the City of Maplewood, Mechanical Fee Schedule <br />Page 23 <br />