Laserfiche WebLink
EULER PARKWAY WATER MAIN IMPROVEMENTS <br />Citizen information Meet <br />November 28, 1994 7;00 nm <br />PROJECT SUMMARY <br />Scope: To install water main within Keller Parkway, Lakeside Court and <br />Arcade Street (see attached figure). <br />Cost: <br />Revenue: <br />Direct Cost to residents (assessments) <br />City costs <br />= $188,600 <br />= $151,400 <br />The City has recently adopted a new water main assessment policy which <br />limits assessments to approximately $4,600 for each buildable lot. The <br />option of deferred assessments is available for senior citizens, retired <br />disabled homeowners and for spillable lots without an existing structure. <br />PURPOSE <br />The purpose of the project is to provide municipal water service to properties <br />adjacent to Keller Parkway, Lakeside Court and Arcade and to "loop" the water <br />distribution system. Benefits include residential water supply and improved fire <br />protection. <br />WHY NOW? <br />The County plans to resurface Keller Parkway in 1995. By coordinating the water <br />main installation with the County's resurfacing, an opportunity is created to install <br />a water main at a most feasible and cost effect time. <br />It is an opportune time because the best location for the water main is beneath the <br />pavement. If the water main is not installed in conjunction with the road <br />resurfacing it may be over 20 years before the main can be installed without having <br />to incur the cost of reconstructing the pavement. By avoiding the cost of pavement <br />replacement, the project cost is reduced by approximately $100,000. <br />Ze'd <br />Page 152 <br />'OSSV 8 OON ±SSNO9 <br />'VMS 9£9 ET9 t2:VT b68T -9T -2T <br />COST <br /># LOTS <br />COST/LOT <br />Keller Parkway <br />4 <br />$290,000 <br />31 <br />$9,350 <br />Lakeside Court <br />$50,000 <br />10 <br />$5,000 <br />TOTAL <br />$340,000 <br />41 <br />$8,300 <br />Revenue: <br />Direct Cost to residents (assessments) <br />City costs <br />= $188,600 <br />= $151,400 <br />The City has recently adopted a new water main assessment policy which <br />limits assessments to approximately $4,600 for each buildable lot. The <br />option of deferred assessments is available for senior citizens, retired <br />disabled homeowners and for spillable lots without an existing structure. <br />PURPOSE <br />The purpose of the project is to provide municipal water service to properties <br />adjacent to Keller Parkway, Lakeside Court and Arcade and to "loop" the water <br />distribution system. Benefits include residential water supply and improved fire <br />protection. <br />WHY NOW? <br />The County plans to resurface Keller Parkway in 1995. By coordinating the water <br />main installation with the County's resurfacing, an opportunity is created to install <br />a water main at a most feasible and cost effect time. <br />It is an opportune time because the best location for the water main is beneath the <br />pavement. If the water main is not installed in conjunction with the road <br />resurfacing it may be over 20 years before the main can be installed without having <br />to incur the cost of reconstructing the pavement. By avoiding the cost of pavement <br />replacement, the project cost is reduced by approximately $100,000. <br />Ze'd <br />Page 152 <br />'OSSV 8 OON ±SSNO9 <br />'VMS 9£9 ET9 t2:VT b68T -9T -2T <br />