My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-22-1994 Council Agenda
>
City Council Packets
>
1990-1999
>
1994
>
06-22-1994 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2013 2:59:35 PM
Creation date
10/9/2013 2:57:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Construction dispute resolution assistance <br />3. Attendance at neighborhood meetings other than those outlined <br />in basic services <br />4. Environmental assessments, worksheets or impact statements <br />5. Preparation of detailed operation and maintenance manuals <br />6. User rate studies <br />7. Pilot testing <br />8. Preparation of applications for funding assistance <br />9. Hydraulic and hydrologic studies <br />a. Hydraulic analysis benefitting an area greater than that of <br />the Proiect. <br />b. Stormwater, surface water, and groundwater quality analyses. <br />c. Wetland delineation and mitigation. <br />10. Change in Scope of Services, including: <br />a. Design revisions resulting from Project scope changes due to <br />coordination of multi - agency reviews (e.g., <br />City /County /MnDot /etc.) after initial coordination with said <br />agency. <br />b. Redesign required by enactment or revisions of codes, laws <br />or regulations. <br />c. Redesign required as a result of developers' changes or <br />failure to render information or decisions in a timely <br />manner. Notice of said additional costs are to be provided <br />prior to work and may require approval of the developer in <br />addition to the City. <br />2.2. The Consultant shall observe, to the same extent as provided in <br />Section 1.5.3, the replacement of all such parts of the Project as may be <br />damaged by fire or other cause during construction and assist the City in <br />arranging for continuation of the work should the contractor default for <br />Page 85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.