My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-23-2013 Council Agenda
>
City Council Packets
>
2010-2019
>
2013
>
10-23-2013 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2013 11:10:22 AM
Creation date
10/22/2013 11:03:46 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Guide to. the Quiet Zone Establishment Process <br />The Quiet Zone Establishment Process continued <br />7. Determine how the quiet zone will be established using one of the following criteria: <br />(Note that Options 2 through 4 will require the use of the FRA Quiet Zone Calculator <br />available at http: / /safetydata.fra.dot.gov /quiet /.) <br />1. Every public highway -rail crossing in the proposed quiet zone is equipped with one <br />or more SSMs. <br />2. The Quiet Zone Risk Index (QZRI) of the proposed quiet zone is less than or equal <br />to the Nationwide Significant Risk Threshold (NSRT) without installing SSMs or <br />ASMs. <br />3. The QZRI of the proposed quiet zone is less than or equal to the Nationwide <br />Significant Risk Threshold (NSRT) after the installation of SSMs or ASMs. <br />4. The QZRI of the proposed quiet zone is less than or equal to the Risk Index with <br />Horns (RIWH) after the installation of SSMs or ASMs. <br />8. Complete the installation of SSMs and ASMs and any other required improvements <br />determined by the diagnostic team at all public, private, and pedestrian crossings within <br />the proposed quiet zone. <br />9. Ensure that the required signage at each public, private, and pedestrian crossing is <br />installed in accordance with 49 CFR Sections 222.25, 222.27, and 222.35, and the standards <br />outlined in the Manual on Uniform Traffic Control Devices. These signs may need to be <br />covered until the quiet zone is in effect. <br />10. Establish the quiet zone by providing a Notice of Quiet Zone Establishment to all of the <br />parties that are listed in 49 CFR Section 222.43(a)(3). Be sure to include all of the required <br />contents in the notice as listed in 49 CFR Section 222.43(d). The quiet zone can take effect <br />no earlier than 21 days after the date on which the Notice of Quiet Zone Establishment is <br />mailed. <br />** *Appendix C to the Train Horn Rule provides detailed, step by step guidance on how to <br />create a quiet zone. * ** <br />7 <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.