Laserfiche WebLink
will be written down by each Party's driver. The records of <br />out -going material will be maintained based upon tons as measured <br />by Ramsey County's loader operator and will be the basis for <br />billing each Party. <br />EQUIPMENT RENTAL <br />Specialty uses of equipment by Parties may be arranged for use at <br />the Parties' own site(s). Ramsey County will transport the screen <br />plant and will charge Parties the applicable labor and rental <br />rates. Rental rate of screen equipment will be billed on actual <br />hours used as recorded on equipment hour meter. Rental or <br />delivery of the screen plant shall be coordinated with Ramsey <br />County. <br />MINIMUM USE <br />Each Party shall reclaim the amount of recycled material up to the <br />tonnage hauled in by the Party less volume loss due to screening. <br />Each Party may release all or part of their material to another <br />Party at their discretion. <br />ACCEPTABLE MATERIALS <br />Each Party will be responsible in its use of the Project and will <br />only dump material conducive to the Project. No hazardous <br />material will be tolerated.. The following materials are not <br />acceptable: rocks, organic material, leaves, contaminated soils, <br />concrete, construction debris. <br />FEES <br />Ramsey County will charge fees to recoup all costs of the Project. <br />At the time of this agreement, user fees to be charged to each <br />9 <br />Page 56 <br />