Laserfiche WebLink
SUBSTANTIAL COMPLETION DATE <br />ORIGINAL: <br />REVISED: <br />PARTIAL PAY ESTIMATE #3 <br />FROM: October 1, 2013 <br />T0: October 25, 2013 <br />CONTRACTOR: FPI PAVING CONTRACTORS, INC. <br />ADDRESS: 3230 RICE STREET, LITTLE CANADA, MN 55117 <br />OWNER: CITY OF LITTLE CANADA <br />PROJECT: LITTLE CANADA ROAD IMPROVMENTS <br />AMOUNT OF CONTRACT <br />ORIGINAL: $ 1,030,026.31 <br />REVISED: <br />ITEM <br />NO. <br />ITEM DESCRIPTION <br />UNIT <br />ORIGINAL CONTRACT <br />QTY. UNIT PRICE <br />THIS PERIOD <br />QTY. TOTAL PRICE <br />TOTAL TO DATE <br />QTY. TOTAL PRICE <br />C ED LE ,0- LITTLE CANADA READ <br />Mow <br />2 <br />MOBILIZATION <br />LS <br />ACRE <br />1.00 <br />0.12 <br />55,000.00 <br />6,500.00 <br />0.25 <br />0.00 <br />$13,750.00 <br />60.00 <br />rr <br />0.17 <br />355,000.00 <br />31,105.00 <br />2101.501 CLEARING <br />3 <br />2101.502 CLEAR <br />TREE <br />8.00 <br />350.00 <br />0.00 <br />60.00 <br />8.00 <br />$2,800.00 <br />2101.506 GRUBBING <br />ACRE <br />0.12 <br />6.500.00 <br />0.00 <br />30.00 <br />0.17 <br />61,10500 <br />32,25000 <br />2101.507 GRUB <br />TREE <br />8.00 <br />250.00 <br />0.00 <br />30.00 <br />9.00 <br />• <br />2104.501 REMOVE SEWER PIPE (STORM) <br />LF <br />45.00 <br />16.80 <br />0.00 <br />$0,00 <br />58.00 <br />3974.40 <br />2104501 REMOVE CONCRETE CURB AND GUTTER <br />LF <br />940,00 <br />6.40 <br />95.00 <br />$608.00 <br />770.00 <br />$4,928.00 <br />2104.501 REMOVE FENCE <br />LF <br />160.00 <br />5.00 <br />160,00 <br />$800.00 <br />160.00 <br />6800.00 <br />2104.501 REMOVE GUARD RAIL <br />LE <br />80.00 <br />0.00 <br />30.00 <br />80.00 <br />0,00 <br />31,200.00 <br />60.00 <br />Cie <br />m <br />12 <br />REMOVE RETAINING WALL <br />SF <br />230,00 <br />4.50 <br />0.00 <br />30.00 11111111CIOSEMI <br />2104.503 REMOVE LANDSCAPING <br />SF <br />1,100.00 <br />1.65 <br />0.00 <br />30.00 <br />2104.505 REMOVE CONCRETE PAVEMENT <br />SY <br />710.00 <br />7.00 <br />14.00 <br />398.00 <br />492,00 <br />33,444.00 <br />13 <br />2104.505 REMOVE BITUMINOUS PAVEMENT <br />SY <br />1.900.00 <br />5.00 <br />533.00 <br />32.665.00 <br />1752,00 <br />58760.00 <br />14 <br />2104.509 REMOVE POLE BASE <br />EACH <br />2.00 <br />1.000.00 <br />1.00 <br />31,000.00 <br />1.00 <br />61,000.00 <br />15 <br />2104.509 REMOVE FLAG POLE <br />EACH <br />3.00 <br />500.00 <br />2.00 <br />31,000.00 <br />2.00 <br />31,000.00 <br />16 <br />17 <br />2104.509 REMOVE HYDRANT <br />2104.509 REMOVE DRAINAGE STRUCTURE <br />Sae <br />EACH <br />4.00 <br />1,890.00 <br />505.00 <br />0.00 <br />0,00 <br />50.00 <br />2.00 <br />33,780.00 <br />50.00 <br />4.00 <br />32,020.00 <br />18 <br />2104.509 REMOVE VALVE <br />EACH <br />1.00 <br />1765.00 <br />0.00 <br />$0.00 <br />1.00 <br />61,765.00 <br />19 <br />1104.511 SAW CU I UUNCRETEJFULL DEPTH) <br />LP <br />LF <br />100.00 <br />850.00 <br />®+ <br />2.35 <br />0.00 <br />50.00 <br />186.00 <br />$492.90 <br />20 <br />2104.513 SAW CUT BITUMINOUS (FULL DEPTH) <br />0.00 <br />30.00 <br />661.00 <br />31 553.35 <br />21 <br />2104.523 SALVAGE SIGN <br />EACH <br />33.00 <br />26.00 <br />0.00 <br />30.00 <br />4,00 <br />510400 <br />22 <br />2104.523 SALVAGE BANNER POLE <br />EACH <br />2.00 <br />500.00 <br />2.00 <br />31,000.00 <br />2.00 <br />31,000.00 <br />23 <br />2104618 SALVAGE PAVERS <br />SF <br />905.00 <br />5.00 <br />0.00 <br />60.00 <br />1013,00 <br />35.065.00 <br />24 <br />2104.523 SALVAGE MAILBOX <br />EACH <br />14.00 <br />36.75 <br />0.00 <br />60.00 <br />10,00 <br />3387.50 <br />25 <br />2105.501 COMMON EXCAVATION (P) <br />CY <br />2,130.00 <br />23.00 <br />0.00 <br />30.00 <br />2130.00 <br />348,990.00 <br />26 <br />2105.501 POND EXCAVATION (RAINWATER GARDENS P <br />CY <br />Sal <br />0 <br />345.00 <br />850.00 <br />1910.00 <br />24.00 <br />30.00 <br />40.00 <br />23.00 <br />250.00 <br />0,00 <br />109.50 <br />63.00 <br />24.00 <br />30.00 <br />$4,380.00 <br />61,449.00 <br />36,000.00 <br />0.00 <br />109.50 <br />30.00 <br />34,380.00 <br />27 <br />28 <br />29 <br />2105.525 TOP SOIL BORROW CV <br />2105.607 <br />882.45 <br />24,00 <br />320,296.35 <br />2112.501 SUBGRADE PREPARATION <br />56 000.00 <br />30 <br />2511.607 CALCIUM CHLORIDE SOLUTION <br />GAL <br />1,000.00 <br />3.00 <br />0.00 <br />$0.00 <br />0.00 <br />30.00 <br />31 <br />2211.501 AGGREGATE BASE. CLASS 5 <br />TON <br />800.00 <br />12.50 <br />17.89 <br />3223.63 <br />17.89 <br />6223.63 <br />AGGREGATE BASE PLACED SIDEWALK <br />CY <br />265.00 <br />20.00 <br />0.00 <br />60.00 <br />200.00 <br />34,000.00 <br />m <br />35 <br />AGGREGATE BASE PLACED <br />2504.602 <br />CY <br />SY <br />SY <br />TON <br />685.00 <br />7,300.00 <br />10,100.00 <br />745.00 <br />15.00 <br />1.80 <br />0,00 <br />0.00 <br />$0.00 <br />5000 <br />600.00 <br />0.00 <br />59,000.00 <br />30.00 <br />2331.604 RECLAIM BITUMINOUS PAVEMENT <br />2.15 <br />7500 <br />0.00 <br />0.00 <br />10.00 <br />30.00 <br />10100.00 <br />0.00 <br />521,71500 <br />50.00 <br />36 <br />37 <br />2350,501 TYPE SPWEB340E WEARING COURSE MIXTURE <br />2350.501 TYPE SPWEB340C WEARING COURSE MIXTURE <br />TON <br />2,155.00 <br />75,00 <br />1201.90 <br />390,142.50 <br />1201.90 <br />390,142.50 <br />38 <br />2350.501 TYPE SPWE6340C WEARING COURSE MIX(ORIVEWAY) <br />TON <br />550.00 <br />100.00 <br />241.21 <br />324,121.00 <br />241.21 <br />324,121.00 <br />39 <br />2411.618 BLOCK RETAINING WALL SPECIAL (WET CAST) <br />SF <br />1,900.00 <br />1.00 <br />300.00 <br />3600 <br />1,250700 <br />15.00 <br />1975.13 <br />0.00 <br />0.00 <br />371,104.68 <br />30.00 <br />30.00 <br />1975.13 <br />1.00 <br />0.00 <br />571.104.68 <br />31 250.00 <br />30.00 <br />A0 <br />2501.602 12" RC FLARED END SECTION W/TRASHGUARO <br />41 <br />2502.541 4 -INCH PERF PE PIPE DRAIN W /SOCK <br />2503.511 8" PVC STORM SEWER <br />LE <br />10.00 <br />31.50 <br />0.00 <br />30.00 <br />0.00 <br />30,00 <br />2503.511 10" DIP STORM SEWER <br />LF <br />21.00 <br />61.00 <br />0.00 <br />30.00 <br />23.00 <br />31,403.00 <br />2503.521 22" SPAN RC PIPE -ARCH SEWER CLIIA <br />LF <br />34.00 <br />5565 <br />0.00 <br />30.00 <br />34.00 <br />31,892.10 <br />45 <br />2503.541 12" RC PIPE SEWER DES 3006, CLV <br />LF <br />172.00 <br />32.55 <br />0.00 <br />30.00 <br />175.00 <br />$5,696.25 <br />A6 <br />15" RC PIPE SEWER DES 3006 CLV <br />LF <br />427.00 <br />33.60 <br />0.00 <br />$0,00 <br />422.00 <br />314179.20 <br />47 <br />A- <br />_2503.541 <br />2503.541 <br />1 <br />746.00 <br />0.00 <br />30.00 <br />754.00 <br />$26.917.80 <br />2503.602 CONNECT TO EXISTING STORM SEWER <br />EACH <br />4.00 <br />1,545.00 <br />0.00 <br />30.00 <br />1,00 <br />$1,545.00 <br />49 <br />2503.602 CONNECT TO EXISTING STORM STRUCTURE <br />EACH <br />2.00 <br />1,945.00 <br />0.00 <br />30.00 <br />3.00 <br />$5.835.00 <br />50 <br />2503.602 8" X 4" PV WYE <br />EACH <br />1.00 <br />2,025.00 <br />0.00 <br />30.00 <br />1.00 <br />32,025.00 <br />51 <br />2503.603 4" PVC PIPE SEWER <br />LF <br />65.00 <br />41.00 <br />0.00 <br />$0.00 <br />90.00 <br />33,690.00 <br />52 <br />2504.602 WATERMAIN PITTING INSPECTION <br />EACH <br />EACH <br />4.00 <br />2.00 <br />1,680.00 <br />0.00 <br />0.00 <br />30.00 <br />30.00 <br />1.35 <br />1.00 <br />$2,284.80 <br />31,585.00 <br />® <br />54 <br />2504.602 WATER SERVICE CONNECTION <br />2504.602 WATERMAIN OFFSET <br />EACH <br />1.00 <br />4,145.00 <br />0.00 <br />$0.00 <br />1.00 <br />34,145.00 <br />55 <br />2504.602 INSTALL HYDRANT AND VALVE <br />EACH <br />2.00 <br />6,225.00 <br />0.00 <br />$0.00 <br />2.00 <br />312,450.00 <br />0 <br />57 <br />2504.602 ADJUST VALVE <br />EACH <br />EACH <br />2.00 <br />1.00 <br />350,00 <br />1,230.00 <br />0.00 <br />$700.00 <br />$0.00 <br />4.00 <br />0.00 <br />31,40200 <br />30.00 <br />2504.602 WM FITTING BOLT REPLACEMENT <br />_ <br />58 - <br />2504.602 8" GATE VALVE AND BOX <br />EACH <br />el <br />WEI= <br />IIIIIMMIN <br />EACH <br />I 1.00 <br />55.00 <br />1.00 <br />18.00 <br />18.00 <br />1.00 <br />3,940.00 <br />46.00 <br />1,490.00 <br />2.235.00 <br />550.00 <br />1,605.00 <br />0.00 <br />0.00 <br />0.00 <br />$0.00 <br />$0.00 <br />50.00 <br />1.00 <br />41.00 <br />33.94000 <br />$7886.00 <br />59 <br />2504.603 1 1/2" TYPE K COPPER PIPE <br />0 <br />m <br />m <br />63 <br />r r CONST DRAINAGE STRUCTURE DESIGN SPEC 24 "X35" <br />2506.502 CONST DRAINAGE STRUCTURE DESIGN 48.4020 <br />2.00 <br />32.98000 <br />0.00 <br />rc <br />0.00 <br />$0.00 <br />$1.650.00 <br />30.00 <br />18.00 <br />rr <br />1.00 <br />335,760 00 <br />61.65000 <br />$1,60500 <br />2506.522 ADJUST FRAME RING AND CASTING <br />2506602 RECONSTRUCT SANITARY MANHOLE <br />64 <br />2511.502 RANDOM RIP RAP, CLASS IV <br />CY <br />10.00 <br />110.00 <br />0.00 <br />50.00 <br />0.00 <br />$0.00 <br />®e <br />GRANULAR BEDDING SPECIAL CV P <br />0 <br />125.00 <br />50.00 <br />0.00 <br />30.00 <br />0,00 <br />30.00 <br />66 <br />2521.501 4' CONCRETE SIDEWALK <br />SP <br />15,500.00 <br />2.90 <br />7657.00 <br />822,205.30 <br />7657.00 <br />322 205,30 <br />2 <br />