Laserfiche WebLink
QTY <br />1E! <br />N0. <br />ITEM DESCRIPTION <br />UNIT <br />ORIGINAL CONTRACT <br />QTY. UNIT PRICE <br />THIS PERI00 <br />TOTAL PRICE <br />TOTAL 0 DATE <br />QTY. TOTAL PRICE <br />10 <br />2573.502 <br />SILT FENCE, TYPE MACHINE SLICED <br />LF <br />60.00 <br />52.85 <br />000 <br />50.00 <br />20.00 <br />557.00 <br />II <br />2573.53 <br />INLET PROTEOTIONJIMMCOZ <br />EACH <br />1.00 <br />5185.00 <br />000 <br />50.00 <br />0.00 <br />50.00 <br />12 <br />2575.000 <br />5EE0I040 (0YPE 270) <br />SY <br />475.00 <br />5561 <br />000 <br />$0 <br />203.00 <br />573283 <br />13 <br />2582.501 <br />PAVEMENT MESSAGE (HANDICAP SYM) -EPDXY <br />EACH <br />2.00 <br />5231.75 <br />0.00 <br />50.00 <br />2.00 <br />3403.50 <br />14 <br />2582.502 <br />4" SOLID VAIITE LINE- EPDXY <br />LF <br />720.00 <br />53.09 <br />0.00 <br />50.00 <br />1308.00 <br />5404192 <br />15 <br />SPEC <br />DENSELY TEST. IN PLACE <br />EACH <br />1,0D <br />582.40 <br />000 <br />50.00 <br />5.00 <br />5412.00 <br />10 <br />SPEC <br />NUCLEAR BITUMINOUS DENS1T6 <br />EACH <br />6.00 <br />525.75 <br />0.00 <br />50.00 <br />0.00 <br />5000 <br />17 <br />18 <br />SPEC <br />SPEC <br />EXTRACTION /GRADATION <br />MR VOIDS <br />EACH <br />EACH <br />2.00 <br />$12360 <br />000 <br />0.00 <br />5000 <br />5000 <br />0.00 <br />0.00 <br />5000 <br />512360 <br />50.00 <br />9C11E0ULE 8.0- SPOONER PARK - TOTAL 50.00 542.354,07 <br />SCHEDULE 7,0 . PEDESTRIAN CURD RAMPg <br />1 <br />2021.501 <br />MOBILIZATION <br />LS <br />100 <br />580000 <br />0.00 <br />50.00 <br />100 <br />580000 <br />2 <br />2521.501 <br />4' CONCRETE PAVEMENT <br />SY <br />10.00 <br />543.20 <br />0,00 <br />50,00 <br />15.70 <br />5870.18 <br />J <br />4 <br />2531.002 <br />2531.602 <br />P0005108A640090 AMP <br />EACH <br />EACH <br />1.00 <br />5.00 <br />592100 <br />51.339.00 <br />0.00 <br />00D <br />5500 <br />1.00 <br />3.00 <br />0027.00 <br />54.017.00 <br />..__, <br />PEDESTRIAN CURD RAMP 0010900 <br />50.00 <br />5 <br />2531618 <br />TRUNCATED 000E0 <br />50 <br />5600 <br />531.00 <br />0.00 <br />50.00 <br />3200 <br />51.160,56 <br />6 <br />2211.501 <br />AGGREGATE BASE CLASS 5 <br />YON <br />137.78 <br />500.00 <br />0.00 <br />50,00 <br />0.00 <br />50.00 <br />SCHEDULE 7.0- PEDESTRIAN CURS RAMPS • TOTAL 50.00 57.009.74 <br />CHANCE ORDER 1.0 - ROSEWOOD DRIVE CORRECTION <br />2021.501 <br />MOBILIZATION <br />LS <br />100 <br />51 00000 <br />0.00 <br />50.00 <br />1.00 <br />51,000.00 <br />2 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />SY <br />433,33 <br />53.50 <br />0.00 <br />50.00 <br />437.00 <br />51,529,50 <br />J <br />2105.501 <br />COMMON 05050/421014(00) <br />CY <br />222.22 <br />517.00 <br />0.00 <br />50.00 <br />220.00 <br />53.700.00 <br />A <br />2105.522 <br />SELECT GRANULAR DORRO1V) <br />GEOTEXTILE FABRIC <br />OY <br />SY <br />111.11 <br />318,59 <br />51700 <br />53.00 <br />0,00 <br />0.00 <br />5800 <br />$0.00 <br />11000 <br />404.00 <br />52,006.00 <br />51,212.00 <br />5 <br />2105.004 <br />6 <br />2211.501 <br />AGGREGATE BASE CLASS 5 <br />YON <br />137.78 <br />500.00 <br />0.00 <br />50,00 <br />0.00 <br />50.00 <br />Y <br />2450.502 <br />TYPE MV4 WEAR COURSE MIXTURE <br />TO N <br />30.07 <br />505,90 <br />0.00 <br />50.00 <br />52.00 <br />53428.80 <br />8 <br />2503.602 <br />CONNECT TO EXISTING STORM STRUCTURE <br />EACH <br />2.00 <br />5775.00 <br />0.00 <br />50.00 <br />1.00 <br />577500 <br />2502.541 <br />4'PERP PE PIPE DRAIN W /SOCK <br />LF <br />289.00 <br />51,50 <br />0.00 <br />50.00 <br />310.05 <br />5405.00 <br />9 <br />2563.801 <br />TRAFFIC CONTROL <br />15 <br />1.00 <br />5500.00 <br />0.00 <br />50.00 <br />1.00 <br />550000 <br />CHANGE ORDER 1.0 • ROSEWOOD DRIVE CORRECTION- TOTAL 50.00 514.854.30 <br />00105UMMARY <br />SCHEDULE 1.0. ROSEWOOD DRIVE • 70TAL <br />SCHEDULE 2.0 • PARK STREET • TOTAL <br />SCHEDULE 3.0- SPRUCE STREET -TOTAL <br />SCHEDULE 4.0 - SYLVAN STREET- TOTAL <br />SCHEDULE 5.0- FIREHALL PARKING LOT • TOTAL <br />SCHEDULE 6.0 • SPOONER PARK • TOTAL <br />SCHEDULE 7.0• PEDESTRIAN CURB RA.A1P5 • TOTAL <br />CHANGE ORDER 1.0 • ROSEWOOD DRIVE CORRECTION- TOTAL <br />TOTAL DID SUMMARY THIS PERIOD <br />TOTAL 010 SUMMARY TO GATE <br />TE6OtOOJQ0 <br />50.00 <br />50.00 <br />50.00 <br />30.00 <br />50.00 <br />50.00 <br />30.00 <br />30,00 <br />50.00 <br />TOTAL TQ 001E <br />AMOUNT EARNED <br />AMOUNT RETAINED <br />MATERIAL ON 508 <br />MATERIAL DEDUCT. <br />0904(005 PAYMENTS <br />AMOUNT DUE <br />TOTAL THIS PENI01) <br />50.00 <br />419.140.91 <br />$0.00 <br />50.00 <br />$19,148.91 <br />TOTAL TO DATE <br />5382.930.13 <br />50 CO <br />S0,00 <br />50.00 <br />5363,791.22 <br />519.146.91 <br />5 <br />577,550.32 <br />591,525.92 <br />547.079.90 <br />562,908.38 <br />549,244.51 <br />042,354.07 <br />07,608,74 <br />014,954.30 <br />5381,835.13 <br />