HomeMy WebLinkAbout11-13-2013 Council MinutesMINUTES OF THE REGULAR MEETING
CITY COUNCIL
LITTLE CANADA, MINNESOTA
NOVEMBER 13, 2013
Pursuant to due call and notice thereof a regular meeting of the City
Council of Little Canada, Minnesota was convened on the 13th day of
November, 2013 in the Council Chambers of the City Center located at
515 Little Canada Road in said City.
Mayor Bill Blesener called the meeting to order at 7:30 p.m. and the
following members of the City Council were present at roll call:
CITY COUNCIL: Mayor Mr. Bill Blesener
Council Member Ms. Shelly Boss
Council Member Mr. John Keis
Council Member Mr. Michael McGraw
Council Member Mr. Rick Montour
ALSO PRESENT: City Administrator Mr. Joel R. Hanson
Cable TV Producer Mr. Kevin Flelander
City Clerk Ms. Kathy Glanzer
MINUTES Boss introduced the following resolution and moved its adoption:
RESOLUTION NO. 2013 -11 -203 — APPROVING THE MINUTES OF
THE OCTOBER 23, 2013 WORKSHOP MEETING AND THE
OCTOBER 23, 2013 REGULAR COUNCIL MEETING AS
SUBMITTED
The foregoing resolution was duly seconded by Keis.
Ayes (5).
Nays (0). Resolution declared adopted.
LAHORE The City Administrator reported that due to a scheduling conflict,
ROAD representatives from SEH and the Ramsey County Sheriff's Department
TRAFFIC could not be present to review the LaBore Road Traffic Control Study.
STUDY The Administrator apologized for the inconvenience. The Administrator
indicated that he would review the results of this study which was
commissioned by the Council given requests that the City has received
over the years for the addition of 4 -way stops and other traffic control
measures along LaBore Road. With the addition of the Pinetrce pond
Development, the Council felt it warranted to have an independent traffic
MINUTES
CITY COUNCIL
NOVEMBER 13, 2013
evaluation conducted. The study was done for the length of Little Canada
Road lying between Edgerton Street and County Road D.
The City Administrator reviewed in detail the SEH September 23, 2013
report, noting that the evaluation included the following:
o The collection of traffic volume data for the approaches to
the intersections.
o Review of previous traffic count and speed data collected
by the Ramsey County Sheriff's Department.
o Estimate of traffic from the new Pinetree Pond
development and future development to the east that would
connect to Cherry Hill Lane and to LaBore Road north of
Cherry Hill Lane.
o A review of the area including available sign distance.
o Review of vehicle crash data.
o Evaluation of warrants for intersection control as
established by the MN Manual on Uniform Traffic Control
Devices.
o Review of potential traffic calming techniques.
The Administrator reviewed the traffic count data as well as traffic
forecasts as outlined in the report. He then reviewed crash data noting that
there has been an average of 1.5 crashes per year for the last 3 years at the
intersection of LaBore Road and Arcade Street, which translates to a crash
rate of 1.06 crashes per million entering vehicles. This is above the state
average for a stop - controlled intersection of 0.30, but below the critical
crash rate of 1.15. Therefore the intersection is considered safe. Crashes
along LaBore Road from Edgerton to County Road D have a rate of 1.73
per million vehicle miles. This is below the 2.30 state average crash rate
for a two lane road, thus indicating a safe condition. The report also
indicates that the average traffic speeds on LaBore Road 32 mph and an
85th percentile speed of 36 mph, which means that 85% of traffic is
traveling at or below 36 mph.
Next reviewed was site distance at the two intersections. The evaluation of
site distance determined that stopping sight distance for LaBore Road
traffic approaching the intersections is more than adequate. The study also
determined that due to adequate stopping sight distance, functional
intersection sight distance, and small volume of traffic that will be making
a left turn from Pinetree Court onto LaBore Road, this intersection is not
considered to be unsafe.
The Administrator noted that intersection control warrant analysis was
done which takes into account traffic volumes, frequency of crashes, and
2
MINUTES
CITY COUNCIL
NOVEMBER 13, 2013
approach speed of major street traffic and compares it to values
established in the MN Manual on Uniform Traffic Control Devices. An
all -way stop warrant analysis was done for both intersections, and it was
determined that an all -way stop was not warranted at either intersection.
Finally, the study considered various traffic calming measures, which
include center medians, traffic lane narrowing, traffic circle, and
permanent variable speed display.
The Administrator then reviewed the study recommendations, which are
as follows:
I. Install two permanent variable speed display signs on
LaBore Road. One both north and south of the curve at
Cherry Hill Lane /Pinetree Court.
2. Install a Red Diamond sign (Road Ends -Type 4 Object
Marker — 0M4 -1, 2, or 3) at the end of Cherry Hill Lane to
the east.
The City Administrator indicated that the concern that he had with the
recommendation to install permanent variable speed display signs was
with their effectiveness over time given that drivers could become immune
to these signs. He also estimated the cost of these boards at $4,000 each.
Keis asked if there are stop signs at the ends of Pinetree Court and Cherry
Hill Lane. The Administrator replied that there was. He again noted that
the recommendation is that 4 -way stops are not warranted at the
intersections of LaBore Road /Pinetree Court/Cherry Hill Lane and LaBorc
Road /Arcade Street. Keis did not feel that SEH would recommend the
variable speed boards if their effectiveness diminished over time.
Laurie Brausen, LaBore Road, asked if the study factored in the fact that
there may be hot spots along LaBore Road. Brausen pointed out that the
area of the curve has only recently become an intersection, and asked if
that was a consideration in the study. Brausen noted that many of the
crashes that have occurred along LaBore Road have involved only one
vehicle, and asked if those events would be included in the crash data.
Brausen reported that there have been a history of one -car crashes along
the curve, again pointing out that this area has only recently become an
intersection with the addition of Cherry Hill Lane and Pinetree Court.
Keis asked if these one vehicle crashes have occurred more at night or
during the day. Brausen replied both. Keis asked about lighting along
LaBore Road. Blesener indicated that intersections are lit. The City
Administrator reported that the crash data reviewed for the report was
3
MINUTES
CITY COUNCIL
NOVEMBER 13, 2013
based on police reports. Some incidents with only minor damage may not
be reported to this data base.
Brausen reported that generally people seem to be driving the speed limit
on LaBore Road. Brausen also indicated that people driving LaBore Road
cannot see Pinetree Court until they round the curve. Reis indicated that
turning left coming out of Pinetree Court onto LaBore Road and looking
to the west, visibility is impeded by the existing vegetation. Brausen
indicated that the vegetation is the Bilek's landscaping, and pointed out
that they have been impacted by the Pinetree Pond development and
would likely not want this vegetation removed.
The City Administrator suggested that he forward tonight's comments on
to SEH and request that they attend the next Council meeting to address
the issues raised this evening.
McGraw asked the Administrator to explain the reasoning for the
Council's ordering the traffic study. The Administrator noted that over the
years the City has received requests for a 4 -way stop at LaBore Road and
Arcade Street. Based on these requests, both the City Engineer and the
Ramsey County Sheriff's Department have indicated that a 4 -way stop
was not warranted. However, with the addition of the Pinetree Pond
development, residents in the area expressed concern about the curve in
this section of LaBore Road. A 4 -way stop was also mentioned for the
new intersection. Therefore, the Council felt it appropriate to commission
an independent traffic study of LaBore Road from Edgerton to County
Road D.
Brausen felt that the addition of a 4 -way stop at LaBore Road and Arcade
Street would make a difference as it would slow traffic before it gets to the
curve. The Administrator indicated that both the City Engineer and
Sheriff's Department felt that if drivers feel a 4 -way stop is not warranted,
they will accelerate leaving the intersection, which would result in higher
speeds around the curve. Brausen felt that once drivers became used to a
4 -way stop, they would obey the stop sign and would proceed at posted
speeds.
Brausen stated that she just wanted it on record that there are a number of
one vehicle accidents that are likely unreported, therefore, were not
considered as part of the study.
The Administrator again indicated that he would have SEH at the next
Council meeting to answer the questions raised.
4
MINUTES
CITY COUNCIL
NOVEMBER 13, 2013
CONSENT
AGENDA
Montour asked if it would be necessary to develop a policy for when
permanent variable speed display signs are installed. The Administrator
noted that in this case, the City has a recommendation from an
independent engineering firm for this installation. He also noted that the
City has the ability to have temporary speed boards posted in areas of the
City.
McGraw introduced the following resolution and moved its adoption:
RESOLUTION NO. 2013 -11 -204 — APPROVING THE CONSENT
AGENDA WHICH CONTAINS THE FOLLOWING:
*APPROVING THE VOUCHERS;
*AUTHORIZING THE CLOSING OF FUND 315 AND TRANSFER
OF FUND BALANCE TO FUND 450;
*CALLINGA WORKSHOP TO CONDUCT THE CITY
ADMINISTRATOR'S PERFORMANCE EVALUATION FOR
WEDNESDAY, DECEMBER 18, 2013 AT 6:30 P.M.;
*APPROVING THE 2014 CONTRACT WITH THE DEPARTMENT
OF CORRECTIONS AND AUTHORIZING THE MAYOR AND CITY
ADMINISTRATOR TO EXECUTE ON BEHALF OF THE CITY;
*AWARDING MISCELLANEOUS STORM SEWER
IMPROVEMENTS AS RECOMMENDED BY THE CITY ENGINEER
AS OUTLINED IN HIS NOVEMBER 8, 2013 REPORT;
*APPROVING PARTIAL PAY REQUEST FOR FRATTALONE
COMPANIES FOR 2013 IMPROVEMENTS AND APPROVING
CHANGE ORDER #1 AS RECOMMENDED BY THE CITY
ENGINEER;
*APPROVING PARTIAL PAY REQUEST FOR FPI PAVING FOR
THE LITTLE CANADA ROAD IMPROVEMENT AS
RECOMMENDED BY THE CITY ENGINEER;
*APPROVING FINAL PAY REQUEST FOR T.A. SCHIFSKY FOR
2012 MILL & OVERLAY IMPROVEMENTS AS RECOMMENDED
BY THE CITY ENGINEER;
*APPROVING MPCA AIR QUALITY MONITORING STATION
LEASE AGREEMENT EXTENSION AND AUTHORIZING THE
5
MINUTES
CITY COUNCIL
NOVEMBER 13, 2013
CONSTRUCTION
MANAGEMENT
PROPOSALS
COOPERATIVE
AGREEMENT
WITH THE
COUNTY FOR
LITTLE
CANADA ROAD
IMPROVEMENT
MAYOR AND CITY ADMINISTRATOR TO EXECUTE ON BEHALF
OF THE CITY
The foregoing resolution was duly seconded by Keis.
Ayes (5).
Nays (0). Resolution declared adopted.
The City Administrator reported that the City received seven responses
to its request for proposals for construction management services on a
Public Works /Parks Facility. The Administrator reported that City staff
and the Mayor reviewed these proposals, and the recommendation is to
interview the firms of Bossardt Corporation, EDS Builders, and James
Steele Construction. The Administrator indicated that all the firms
submitting proposals would be more than capable of providing the service,
but it was felt that these three firms would best meet the City's needs.
The Council discussed possible interview days, with the consensus being
that the dates of November 19, 20, or 21 would be workable. The City
Administrator was instructed to set an interview date that would work for
the construction management firms. (It is noted that the interview was set
for Tuesday, November 19, 2013 beginning at 5:30 p.m. at the City
Center.)
The City Administrator presented a Cooperative Agreement with Ramsey
County which outlines the County's cost participation in the Little Canada
Road improvement project. It was noted that total project costs are
projected at $1,442,641.38. The County is responsible for 74% of these
costs ($1,064,131.78), and the City would pay the balance at $378,509.60.
The Administrator stated that the Little Canada Road project is an
example of intergovernmental cooperation, and pointed out that if this
project had not proceeded as a joint project between the County and the
City, it would not have gotten done.
Blesener stated that his only disappointment is that the project will not be
completed in 2013. It was pointed out that it was the coordination of the
various utility work that needed to be done that delayed the completion.
McGraw introduced the following resolution and moved its adoption:
RESOLUTION NO. 2013 -11 -205 — APPROVING THE
COOPERATIVE AGREEMENT WITH RAMSEY COUNTY FOR THE
LITTLE CANADA ROAD IMPROVEMENT AND AUTHORIZING
6
MINUTES
CITY COUNCIL
NOVEMBER 13, 2013
THE MAYOR AND CITY ADMINISTRATOR TO EXECUTE THE
AGREEMENT ON BEHALF OF THE CITY
The foregoing resolution was duly seconded by Montour.
Ayes (5).
Nays (0). Resolution declared adopted.
LITTLE The Administrator reviewed his report dated November 8, 2013
CANADA outlining the necessary easement acquisitions for sidewalk improvements
ROAD along Little Canada Road. The Administrator noted that appraisals were
EASEMENT done for easements needed from St. John's Church, 334 Little Canada
ACQUISITION Road, and 300 Little Canada Road. Easements are also needed from 316
Little Canada Road, 328 Little Canada Road, and 2635 Edgerton Street.
Rather than obtaining easements for these three properties, the property
owners agreed to provide the easements at the same residential land costs
per square foot that were obtained for 334 Little Canada Road plus $950
(the cost of the appraisal based on the quote obtained earlier this year).
The Administrator indicated that obtaining these easements on a voluntary
basis is less expensive to the City than if the eminent domain process were
needed.
The Administrator indicated that the action before the Council would be to
make an offer of just compensation for the three properties that were
appraised. The action on the other three properties would be to authorize
payments for the easements as proposed.
Boss introduced the following resolution and moved its adoption:
RESOLUTION NO. 2013 -11 -206 — AUTHORIZING CITY STAFF TO
MAKE AN OFFER OF JUST COMPENSATION FOR THE
APPRAISED VALUE PLUS AN ADDITIONAL 050 TO THE
PROPERTY OWNERS OF 300 LITTLE CANADA ROAD, 334 LITTLE
CANADA ROAD, AND ST. JOHN'S CHURCH AS WELL AS
AUTHORIZING CITY STAFF TO AUTHORIZE PAYMENTS FOR
EASEMENTS TO THE OWERS OF 316 LITTLE CANADA ROAD,
328 LITTLE CANADA ROAD, AND 2635 EDGERTON STREET AS
OUTLINED IN THE CITY ADMINISTRATOR'S NOVEMBER 8, 2013
REPORT
The foregoing resolution was duly seconded by McGraw.
Ayes (5).
Nays (0). Resolution declared adopted.
7
MINUTES
CITY COUNCIL
NOVEMBER 13, 2013
SEH The City Administrator reported that he received a quote from SEH to
QUOTE FOR conduct a quiet zone study for the at grade railroad crossings in Little
QUIET ZONE Canada used by the Canadian Pacific Railroad. The City of Shoreview
STUDY has commissioned SEH to conduct a quiet zone study in their city at a cost
of $12,000. The quote for Little Canada's study is $10,000. The
Administrator recommended approval of the quote, and felt it would be
beneficial to have a coordinated approach in conducting this study
between the two cities. He also noted that the City of Maplewood may
also participate in this study.
Rob Mangles, TIS Rail Transportation Consultants, reported that they
wanted to also provide a proposal to do the same study, but understood the
City's rational in proceeding with SEH. Mangles indicated that he wanted
to introduce himself to the City and ask that his firm be considered in
future proposals. Blesener pointed out the City's desire for a coordinated
approach between Shoreview and Little Canada relative to this study, and
suggested that there may be future opportunities that result from the study
findings.
Mangles presented information on the work that his firm has done as well
as information on his background. He also outlined some of the quiet
zone study process as well as Federal requirements that railroads are
subject to. Mangles indicated that he would submit his company's
background information to the City Administrator for future consideration.
Reis introduced the following resolution and moved its adoption:
RESOLUTION NO. 2013 -11 -207 — ACCEPTING THE QUOTE OF
SEH TO CONDUCT A QUIET ZONE STUDY FOR THE CITY OF
LITTLE CANADA AT A COST OF $10,000 AND AUTHORIZING
THE MAYOR AND CITY ADMINISTRATOR TO EXECUTE THE
APPROPRIATE DOCUMENTS ON BEHALF OF THE CITY
The foregoing resolution was duly seconded by Boss.
Ayes (5).
Nays (0). Resolution declared adopted.
STRUCTURAL The City Administrator reported that the City Engineer has arranged for
EVALUATION/ a topographical survey and boundary survey for the new Public Works
SURVEYING- garage site. The surveyor has done other work in the City for other public
NEW PUBLIC projects. The cost of this work is expected to be about $2,500.
WORKS SITE
With regard to a structural evaluation of the northeast portion of the main
building constructed in 1993, the Administrator reported that five quotes
8
MINUTES
CITY COUNCIL
NOVEMBER 13, 2013
were obtained. He indicated that one of the elements for consideration
was whether or not this portion of the building would be suitable for
salt/sand storage. One of the firms submitting quotes indicated that given
the steel construction of the building and conflicts with salt and moisture,
it is highly unlikely that the building would be suitable for this use.
Therefore, the Administrator recommended that this component of the
study analysis be eliminated.
The Administrator pointed out that Paulson & Clark Engineering
submitted the low quote, but that quote did not include a roof evaluation.
The Administrator felt that based on the results of the evaluation of other
building components, the City could decide whether or not a roof
evaluation was necessary. The Administrator recommended that the low
quote submitted by Paulson & Clark be awarded.
Montour introduced the following resolution and moved its adoption:
RESOLUTION NO. 2013 -11 -208 — AWARDING THE LOW QUOTE
OF PA ULSON & CLARK ENGINEERING IN THE RANGE OF $800
TO $1,200 FOR STRUCTURAL ANALYSIS OF 2858 CENTERVILLE
ROAD NOTING THAT THIS EVALUATION WILL NOT INCLUDE
ROOF EVALUATION
The foregoing resolution was duly seconded by Reis.
Ayes (5).
Nays (0). Resolution declared adopted.
FUND The City Administrator reported that in following the City's General Fund
TRANSFER Cash Flow Policy it is recommended that $544,000 be transferred from the
General Fund to the Fund Capital Improvement Fund. This policy
provides that the General Fund balance be maintained at a range of 42.5%
to 65% of budgeted General Fund expenditures. The recommended
transfer will retain the General Fund balance at the high end of the range.
The Administrator pointed out that the City does not levy for General
Capital Improvement expenses, so a transfer to this fund helps with one-
time expenses such as new snow plows, fire trucks, etc.
McGraw introduced the following resolution and moved its adoption:
RESOLUTION NO. 2013 -11 -209 — AUTHORIZING THE TRANSFER
OF $544,000 FROM THE GENERAL FUND TO THE GENERAL
CAPITAL IMPROVEMENT FUND CONSISTENT WITH THE
CITY'S FINANCIAL POLICIES
9
MINUTES
CITY COUNCIL
NOVEMBER 13, 2013
AUTHORIZE
NEIGHBORHOOD
MEETINGS FOR
POTENTIAL
2014
IMPROVEMENT
PROJECTS
The foregoing resolution was duly seconded by Montour.
Ayes (5).
Nays (0). Resolution declared adopted.
It was noted that there was a fund transfer approved as part of the Consent
Agenda. The Administrator indicated that that transfer involved the
transfer of a remaining balance of $964 from a closed bond fund to the
Infrastructure Capital Improvement Fund, which was minor in nature.
The Administrator reported that staff is proposing that neighborhood
meetings be held on the potential improvement of Australian Avenue
east of Lakeshore Avenue and the improvement of Schletty Drive south
of Little Canada Road. The Administrator pointed out that in addition
to discussion a street improvement, watermain is also proposed for these
areas. The Administrator indicated that with the exception of Vanderbie
north of Allan Avenue, these are the last two streets in the City without
watermain.
The Administrator reported that the City Engineer is recommending that
the City's cap assessment rates for street reconstruction for 2014 be
increased to $65.25 per front foot for residential property and $130.50 per
front foot for commercial property. He is also recommending the capped
water main rate be increased to $7,100.
Montour introduced the following resolution and moved its adoption:
RESOLUTION NO. 2013 -11- 210 - AUTHORIZING CITY STAFF TO
CONDUCT NEIGHBORHOOD MEETINGS ON THE
IMPROVEMENT OF SCHLETTY DRIVE SOUTH OF LITTLE
CANADA ROAD AND IMPROVEMENT OF AUSTRALIAN AVENUE
EAST OF LAKESHORE AVENUE AS RECOMMENDED BY THE
CITY ADMINISTRATOR
The foregoing resolution was duly seconded by Boss.
Ayes (5).
Nays (0). Resolution declared adopted.
Blesener introduced the following resolution and moved its adoption:
RESOLUTION NO. 2013 -11- 211- ADOPTING THE 2014 CAPPED
ASSESSMENT RATES AS FOLLOWS:
$65.25 PER FRONT FOOT FOR RESIDENTIAL STREETS
10
MINUTES
CITY COUNCIL
NOVEMBER 13, 2013
$130.50 PER FRONT FOOT FOR COMMERCIAL STREETS
$7,100 FOR WATERMAIN IMPROVEMENT
The foregoing resolution was duly seconded by Montour.
Ayes (5).
Nays (0). Resolution declared adopted.
PAY OFF The City Administrator reported that the bank that owns Unit #135 at
REQUEST — the Canabury Square Condominiums will be donating the unit to Habitat
CANABURY for Humanity. The bank is requesting that they be allowed to pay off the
SQUARE HIA assessment on this property. The Administrator noted that when the
UNIT #135 HIA assessment was adopted, payoffs were not permitted as the City
required the revenue stream from this assessment to meet debt service.
The Administrator recommended that if a payoff is considered, that it
include all of the interest due through the term of the assessment. The
Administrator indicated that not to include this interest would result in
general taxpayers picking up this cost. It was the consensus of the Council
to allow the payoff provided that interest is paid through the term of the
assessment.
2858 Keis asked the status of the occupants at 2858 Centerville Road. The
CENTERVILLE Administrator reported that the occupants have requested to be allowed to
ROAD stay until the end of December. They were told, however, that this is not
practical and the matter has been turned over to the City Attorney to serve
on unlawful detainer on these occupants. That process is underway.
CITY The City Administrator welcomed the City Attorney's firm, Kelly &
ATTORNEY I:,emmons, to Little Canada. They have recently moved into the building
located at 219 Little Canada Road.
ADJOURN There being no further business, the meeting was adjourned at 8:52 p.m.
W lli&iar
nson, City Administrator
11
lesener, Mayor