Joel Hanson <br />From: Joel Hanson <br />Sent: Friday, December 13, 2013 2:43 PM <br />To: Tcorbett gsteeleconstruction.com <br />Cc: Chad Lemmons <br />Subject: CM Contract <br />Attachments: CM Contract - Working Draft - 12.13.13.docx <br />Troy: <br />I've gone through the draft CM contract and I modified it as follows: <br />2.6.x - $1,000,000 limits are too low. I assume JSC has an umbrella or higher base limits than $1,000,000. I need them <br />raised and ideally, $5,000,000 of coverage would be desirable. <br />2.6.5— I would think Professional Liability Insurance should be carried. However, if you currently don't have that as part <br />of your insurance package, let me know and we will figure something out. <br />3.2.10 — Modified wording to conform to representations at interview. <br />3.2.19 — Attempted to clarify how bidder interest is to be developed per our recent discussion. <br />3.3.12.4 — Deleted this as it provides too big an out on the CM's responsibility to ensure the project is delivered per <br />construction documents. <br />8.2 — Deleted Mediation <br />8.3 — Deleted Arbitration <br />9.4 — Modified to allow for notice and an opportunity to cure. <br />9.7 — Deleted — we would not be paying termination expenses if the termination is "for cause ". <br />10.1— Deleted the reference to arbitration. <br />12.0 - Added language about taking advantage of tax exempt status and that Contractor is not allowed to perform any <br />work on the job (bidding) and any incidental work shall be with the prior approval of the Owner's representative. <br />I'm forwarding it to our City Attorney for comment as well. If you have questions, let me know. <br />Thanks <br />Joel R. Hanson <br />City Administrator <br />(651) 766-4040 <br />2 <br />