My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-18-2013 Council Agenda
>
City Council Packets
>
2010-2019
>
2013
>
12-18-2013 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2013 8:58:28 AM
Creation date
12/17/2013 8:43:43 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05/.112014 » <br />.3 Substantial Completion date or milestone dates: <br />«1211.5/2.014 » <br />.4 Other: <br />« » <br />§ 1.1.5 The Owner intends the following procurement method for the Project: <br />(identify method such as competitive bid, negotiated Contract or multiple Prince Contracts.) <br />«eon titi,vebid. lulnalwm,mullsS1ytrint11. i1ttrtit }111111hgte lisreserOPArmaierills ivy Owner thrnueh Purchasing <br />Anent » <br />§1.1.6 The Owner's requirements for accelerated or (fast -track scheduling, multiple bid packages, or phased <br />construction are set forth below: <br />(List number and type of bid/procurement packages) <br />« » <br />§ 1.1.7 Other Project information: <br />(ldewt& special characteristics or needs of the Project not provided elsewhere, such as environmentally responsible <br />design or historic preservation requirements.) <br />§ 1.1.8 The Owner identifies the following representative in accordance with Section 5.5: <br />(List name, address and other information) <br />«tool 11aiiSon, Cit' Adi nnlsnator -» <br />Litkcsnada : <br />'> 1 l ;it1le Canada , t oad Dust <br />Little Canada MN 55117 <br />01- 766404Q <br />1od hanSOfl(d) 1 1 tilacanada nn <br />«» <br />« » <br />« » <br />e » <br />§1.1.9 The persons or entities, in addition to the Owner's representative, who are required to review the <br />Construction Manager's submittals to the Owner are as follows: <br />(Last name, address and other information) <br />«t_I;IfO) -» <br />§1.1.10 Unless provided by the Construction Manager, the Owner will retain the following consultants and <br />contractors: <br />(List mute, legal status, address and other information.) <br />.1 Land Surveyor: <br />« » <br />« » <br />BMA Document c132° -zoos uo.+rorsv BOO m 1992> . < p v'vohc ,.; 1913 1900, 199 n, d 2009 by The AMOYIC00 000606060 oc Arolixtects. All <br />l .ed by nrn 9ottware at 14:31:23 on 11/> ou unna, Order No. 1645001910.1 which <br />114960130561 <br />ex10reo on 10/11/6014, and to not for ronolc. <br />Veer 0060,: <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.