.7 Daily logs; <br />.8 Summary of all Multiple Prime Contractors' Applications for Payment; <br />.9 Cumulative total of the Cost of the Work to date including the Construction Manager's compensation <br />and reimbursable expenses at the job site, if any; <br />.10 Gash -!low- and- I'oreeust- reports,;rand <br />.11 Any other items the Owner may reasoluthiy require: <br />§-313:2o.2 in-add it- ion f-or-Pr:0jeets- constructed -on -the hasis -o!' (he- Cost - eni- tare -Wolh. the Cons <br />include the following additional inconnatio11- n- its - progress -repo! s; <br />- 1-- CSantrnelor- s work- three - report; <br />.2--- 14ettrinmewt- etilizetion- report; <br />,3- ----Goss- su11i1 1 eampnring+netuaFeesaa -tm lid rntnl- easbestirmr <br />:2-- -- Any - other- 4-ea1& as4Ha4}woer- nay -ree wire- <br />« » <br />etion -Mann <br />er -shall <br />§ 3.3.21 Utilizing the documents provided by the Contractor, the Construction Manager shall maintain at the site 0110 <br />copy of all Contracts, Drawings, Specifications, addenda, Change Orders and other Modifications, in good order anal <br />marked currently to record all changes and selections made during construction, and in addition, approved Shop <br />Drawings, Product Data, Samples and similar required submittals. The Construction Manager shall maintain records, <br />in duplicate, of principal building layout lines, elevations of the bottom of footings, floor levels and key site <br />elevations certified by a qualified surveyor or professional engineer. The Construction Manager shall make all such <br />records available to the Architect and the Contractor, and upon completion of the Project, shall deliver them to the <br />Owner. <br />§ 3.3.22 The Construction Manager shall arrange for the delivery, storage, protection and security of Owner - <br />purchased materials, systems and equipment that are a part of the Project until such items are incorporated into the <br />Work. <br />§ 3.3.23 With the Architect and the Owner's maintenance personnel, the Construction Manager shall observe the <br />Contractor's or Multiple Prime Contractors' final testing and start -up of utilities, operational systems and equipment <br />and observe any commissioning as the Contract Documents may require. <br />§ 3.3.24 When the Construction Manager considers each Contractor's Work or a designated portion thereof is <br />substantially complete, the Construction Manager shall,, jointly with the Contractor, prepare for the Architect a list of <br />incomplete or unsatisfactory items and a schedule for their con Motion. The Construction Manager shall assist the <br />Architect in conducting inspections to determine whether the Work or designated portion thereof is substantially <br />complete. <br />§ 3.3.25 When the Work or designated portion thereof is substantially complete, the Construction Manager shall <br />prepare, and the Construction Manager and Architect shall execute, a Certificate of Substantial Completion. The <br />Construction Manager shall submit the executed Certificate to the Owner and Contractor. The Construction Manager <br />shall coordinate the correction and completion of the Work. Following issuance of a Certificate of Substantial <br />Completion of the Work or a designated portion thereof, the Construction Manager shall evaluate the completion of <br />the Work of the Contractor or Multiple Prime Contractors and make recommendations to the Architect when Work <br />is ready for final inspection. The Construction Manager shall assist the Architect in conducting final inspections. <br />§ 3.3.26 -1'he Construction Manager shall forward to the Owner, with a copy to the Architect, the following <br />information received from the Contractor or Multiple Prime Contractors: (1) certificates of insurance received 110111 <br />the Contractor or Multiple Prime Contractors; (2) consent of surety or sureties, if any, to reduction in or partial <br />release of retainage or the making of final payment; (3) affidavits, receipts, releases and waivers of liens or bonds <br />indemnifying the Owner against liens; and (4) any other documentation required of the Contractor under the <br />Contract Documents, including warranties and similar submittals. <br />[ Formatted: .0 <br />-- -- 0 - -- <br />TYT Uo mnon< C132" - 2 2009 09 (lom )100 m[ly UB01°'Cifn - }992). (b)pyright " 1973, 1900, 1992 and 2005 by The 0 olacm InotttAto of Architect). All <br />/19/2013 UnOO[ 06(808 »o.1619008370.1 which <br />axUlras on 10/17/ 2019, nod by not [or m:mlo. <br />( <br />Vno[ Autos: (1402015956) <br />13 <br />