My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-18-2013 Additions
>
City Council Packets
>
2010-2019
>
2013
>
12-18-2013 Additions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2013 10:04:49 AM
Creation date
12/19/2013 10:03:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Init. <br />TABLE OF ARTICLES <br />1 INITIAL INFORMATION <br />2 CONSTRUCTION MANAGER'S RESPONSIBILITIES <br />3 SCOPE OF CONSTRUCTION MANAGER'S BASIC SERVICES <br />4 ADDITIONAL SERVICES <br />5 OWNER'S RESPONSIBILITIES <br />6 COST OF THE WORK <br />7 COPYRIGHTS AND LICENSES <br />8 CLAIMS AND DISPUTES <br />9 TERMINATION OR SUSPENSION <br />10 MISCELLANEOUS PROVISIONS <br />11 COMPENSATION <br />12 SPECIAL TERMS AND CONDITIONS <br />13 SCOPE OF THE AGREEMENT <br />ARTICLE 1 INITIAL INFORMATION <br />§ 1.1 This Agreement is based on the Initial Information set forth in this Section 1.1. <br />(Note the disposition for the following items by inserting the requested information or a statement such as "not <br />applicable," "unknown at time of execution" or "to be determined later by mutual agreement. ") <br />§ 1.1.1 The Owner's program for the Project: <br />(Identify documentation or state the manner in which the program will be developed) <br />1 (see Exhibit A) <br />§ 1.1.2 The Project's physical characteristics: <br />(Identify or describe, if appropriate, size, location, dimensions, or other pertinent information, such as geotechnical <br />reports; site, boundary and topographic surveys; traffic and utility studies; availability of public and private utilities <br />and services; legal description of the site; etc.) <br />TBD <br />§ 1.1.3 The Owner's budget for the Cost of the Work, as defined in Section 6.1: <br />(Provide total and, if known, a line item breakdown.) <br />Two Million, Five hundred thousand ($2,500,000) <br />§ 1.1.4 The Owner's anticipated design and construction schedule: <br />.1 Design phase milestone dates, if any: <br />Preliminary Design, 1/15/2014 <br />Final Design, 3/7/2014 <br />.2 Commencement of construction: <br />AIA Document C132T'^ — 2009 ¶_formerly B801 TMCMa- 1992). Copyright 07973, 1980, 1992 and 2009 by The American Institute of Architects. All rights <br />reserved. WARNING: This A1/7.' Document is protected by Ll.8. Copyright Law and International Treaties. Unauthorized reproduction or distribution of <br />this AIA Document, or any portion of it, inay result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possiis le. under <br />the law. This document was produced by AIA software at 70:12:33 on 12/18/2013 under Order No.1645001270_1 which expires on 10/17/2014, and is not for <br />resale. <br />User Notes: 3 (1400123506) <br />
The URL can be used to link to this page
Your browser does not support the video tag.