My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-06-2014 Council Agenda
>
City Council Packets
>
2010-2019
>
2014
>
01-06-2014 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2014 6:38:56 PM
Creation date
1/6/2014 6:32:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2013 <br />new edition <br />2013 <br />• • rs <br />DEVELOPMENT, INC. <br />2013 <br />James J. Hill <br />It l:Fli It C is I. 11111 AItY <br />2013 <br />2013 <br />OBGYN Specialists <br />Description: Design -build drawings for the interior build -out of an OBGYN <br />clinic. <br />Contact: <br />Kate Hebei, New Edition Facility Designers <br />e: info @newedition - inc.com <br />p: (651) 698-3441 <br />Consultants: Design build (contracted by New Edition in the field) <br />Stonebridge Lofts <br />Description: 12 story multifamily residential building with 165 residential units <br />located in the Warehouse District in Downtown Minneapolis.(This project is <br />nearing completion). We are also working on a new luxury loft building with <br />Shamrock Development called the Eclipse. (the same contact info applies. <br />Contact: Doug Marquart- Shamrock Development, Inc. <br />e: dmarquart@shamrockcompanies.com <br />p: (612) 333 -0350 <br />Consultants: Electrical Engineer- Bill Hicks, Metropolitan Mechanical <br />Mechanical Engineer- Jason Haugerud, Parsons Electric <br />James J. Hill Reference Library renovations <br />Description: Design services for upgrades to an existing catering kitchen and <br />creating a master plan for future renovations. <br />Contact: Greg Fouks, President of James J. Hill Reference Library <br />e: gafouks @lihill.org <br />p: (651) 265-5500 <br />Consultants: Not applicable <br />Palace Theatre Renovation Planning &Feasibility Study <br />Description: The planning, cost estimating and schematic design of renovating <br />the old Palace Theatre in Downtown St. Paul into a new music venue. <br />Contact: Joe Spencer, Director of Arts and Culture for the City of St. Paul <br />e: joe.spencer @stpaul.gov <br />p: (651) 266 -8524 <br />Consultants: Not applicable <br />Zumbrota Visitor Center& Goodhue Pioneer Trailhead Study <br />Description: The schematic design of a new Goodhue Pioneer Trailhead & <br />Zumbrota Area Visitor center. <br />Contact: Dan King, Community Development Director <br />e: dking @ci.zumbrota.mn.us <br />p: (507) 732 -7318 <br />Consultants: Not applicable <br />49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.