My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-06-2014 Council Agenda
>
City Council Packets
>
2010-2019
>
2014
>
01-06-2014 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2014 6:38:56 PM
Creation date
1/6/2014 6:32:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2008 <br />C I T Y O F <br />H I L L T O P <br />11k <br />2008 <br />2008 <br />2008 <br />City of Hilltop Public Works Facility <br />Description: The city of Hilltop is a small community completely surrounded by <br />the City of Columbia Heights. Their one man public works department was <br />working out of his truck, a residential style shed, and an empty lot. The new <br />facility is just over 3,000 square feet, has heated space for an office, a <br />fabrication and work area, and storage for the city's equipment. <br />Contact: Ruth Nelsen, City Administrator <br />e: rnelsen @hilltop.govoffice.com <br />p: (763) 571 -2023 <br />Consultants: Electrical Engineer- Dan Paulson, Paulson & Clark Engineering <br />Mechanical Engineer- Rob Lowe, Paulson & Clark Engineering <br />City of Waconia Public Works Facility <br />Description: A new public works facility consisting of 44,660 square feet on a <br />split level site. Through the use of multiple construction bid packages, the city <br />was able to expedite the construction schedule by having portions of the bid <br />documents issued, for structural items with long lead - times, while many of the <br />design details were still being finalized by the design team. <br />Contact: Susan Arntz, City Administrator <br />e: sarntz @waconia.org <br />p: (952) 442 -2184 <br />Consultants: Electrical Engineer- Dan Paulson, Paulson & Clark Engineering <br />Mechanical Engineer -Shane Albertson, Albertson Engineering <br />City of Rockford Public Works Facility <br />Description: The 24,000 sq. ft. facility features a 15,650 sq. ft. vehicle storage <br />area, a 1,200 sq. ft. vehicle wash bay, a 3,335 sq. ft vehicle maintenance area <br />and a 3,825 sq. ft. office/ locker rooms/ kitchen/ meeting area. <br />Contact: Nancy Carswell, City Administrator <br />e: nancyc @cityofrockford.org <br />p: (763) 477 -6565 <br />Consultants: Electrical Engineer- Dan Paulson, Paulson & Clark Engineering <br />Mechanical Engineer- Rob Lowe, Paulson & Clark Engineering <br />City of Belle Plaine Public Works Study <br />Description: We prepared a space needs analysis and developed a preliminary <br />building design and site layout for the Belie Plaine Public Works. <br />Contact: Al Fahey, Public Works Superintendent <br />e: publicworks @ci.belleplaine.mn.us <br />p: (952) 873 -6742 <br />Consultants: Not applicable <br />57 <br />2.9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.